Applied Digital Ellendale
OperationalApplied Digital / CoreWeave · Ellendale, ND
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Applied Digital Ellendale by Applied Digital / CoreWeave in Ellendale, ND is planned at 400 MW and about $2 billion, and is operational, with a 2027 target as of September 2026. It ranks 48th of 54 tracked US mega projects by planned capacity, 0.4% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is high: both figures come from the developer or a filing and the site has physical progress or firm contracts. It is the only mega project Malachi.Energy tracks in North Dakota.
Key figures
400 MW
Developer disclosed
$2 billion
Developer-stated campus cost
Operational
As of September 2026
2027
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Confidence
- High: both figures come from the developer or a filing and the site has physical progress or firm contracts.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- GlobeNewswire, July 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Applied Digital's Polaris Forge campus leased to CoreWeave: 175 MW live as of July 2026, 400 MW contracted at full build, with $1.59B in notes priced in June 2026 for a fourth building.
Location
- Site
- Ellendale, ND
- Coordinates
- 46.00, -98.52
- State directory
- Data centers in North Dakota (13 verified facilities)
Other tracked projects in North Dakota
This is the only mega project Malachi.Energy tracks in North Dakota.
Cite this record
Rein, Malachi (2026). Applied Digital Ellendale (Ellendale, ND). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/applied-digital-ellendale
@misc{malachienergy_applied_digital_ellendale_2026,
author = {Rein, Malachi},
title = {Applied Digital Ellendale (Ellendale, ND)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/applied-digital-ellendale}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.