AVAIO Digital Leo
Under ConstructionAVAIO Digital · Pulaski County, AR
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
AVAIO Digital Leo in Pulaski County, AR is planned at 1.0 GW and about $21 billion, and is under construction, with a 2028 target as of October 2026. It ranks 30th of 56 tracked US mega projects by planned capacity, 0.9% of the 106.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. It is the only mega project Malachi.Energy tracks in Arkansas.
Key figures
1.0 GW
Developer disclosed
$21 billion
Developer-stated campus cost
Under construction
As of October 2026
2028
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Nearest high-voltage transmission
- The campus sits 1.6 miles from the nearest 500 kV transmission line, owned by Entergy Arkansas Inc, per HIFLD transmission data current to September 2023, computed 2026-10-02. 3 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 500 kV. Source: HIFLD
- Location basis
- Public address, geocoded. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: Arkansas Democrat-Gazette, AVAIO officials discuss project details for $6 billion data center.
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Arkansas Economic Development Commission, January 2026
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
AVAIO Digital's 296-acre Project Leo campus in Pulaski County, with 150 MW contracted from Entergy Arkansas and demand of up to 1 GW at full build; the first phase is $6B of more than $21B through full development. The developer reports it has broken ground, and said in July 2026 that the first two buildings would be operational by 2028.
Location
- Site
- Pulaski County, AR
- Coordinates
- 34.62, -92.24
- State directory
- Data centers in Arkansas (2 verified facilities)
Other tracked projects in Arkansas
This is the only mega project Malachi.Energy tracks in Arkansas.
Cite this record
Rein, Malachi (2026). AVAIO Digital Leo (Pulaski County, AR). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/avaio-digital-leo
@misc{malachienergy_avaio_digital_leo_2026,
author = {Rein, Malachi},
title = {AVAIO Digital Leo (Pulaski County, AR)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/avaio-digital-leo}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.