AWS Pennsylvania
OperationalAmazon Web Services · Salem Township, PA
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
AWS Pennsylvania by Amazon Web Services in Salem Township, PA is planned at 1.9 GW and about $20 billion, and is operational, with a 2032 target as of September 2026. It ranks 17th of 54 tracked US mega projects by planned capacity, 1.8% of the 109.2 GW national total. The capacity figure is utility, iso, or government filing; the investment figure is multi-site or statewide commitment. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. It is the only mega project Malachi.Energy tracks in Pennsylvania.
Key figures
1.9 GW
Utility, ISO, or government filing
$20 billion
Multi-site or statewide commitment
Operational
As of September 2026
2032
First load or full build per source
Where the figures come from
- Capacity basis
- Utility, ISO, or government filing
- Investment basis
- Multi-site or statewide commitment
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Times Leader, August 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
AWS hyperscale campus beside the Susquehanna nuclear plant with a 1.9 GW Talen Energy PPA. The first building has served load since 2023 and three were operational by August 2026; up to 20 buildings at full build, with the PPA ramping to 1,920 MW by 2032.
Location
- Site
- Salem Township, PA
- Coordinates
- 41.56, -76.16
- State directory
- Data centers in Pennsylvania (46 verified facilities)
Other tracked projects in Pennsylvania
This is the only mega project Malachi.Energy tracks in Pennsylvania.
Cite this record
Rein, Malachi (2026). AWS Pennsylvania (Salem Township, PA). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/aws-pennsylvania
@misc{malachienergy_aws_pennsylvania_2026,
author = {Rein, Malachi},
title = {AWS Pennsylvania (Salem Township, PA)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Utility, ISO, or government filing. Investment basis: Multi-site or statewide commitment.},
url = {https://malachi.energy/data-centers/projects/aws-pennsylvania}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: utility, iso, or government filing. Investment basis: multi-site or statewide commitment. Dataset version . Maintained by Malachi Rein for Malachi.Energy.