Google Kansas City

Under Construction

Google · Clay County, MO

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Summary

Google Kansas City in Clay County, MO is planned at 700 MW and about $10 billion, and is under construction as of September 2026. It ranks 43rd of 54 tracked US mega projects by planned capacity, 0.6% of the 109.2 GW national total. The capacity figure is press or analyst reported; the investment figure is bond authorization cap. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 2 mega projects in Missouri in total.

Key figures

Planned capacity

700 MW

Press or analyst reported

Announced investment

$10 billion

Bond authorization cap

Status

Under construction

As of September 2026

Target year

Not stated

No public date

Where the figures come from

Capacity basis
Press or analyst reported
Investment basis
Bond authorization cap
Confidence
Medium: one figure is reported, estimated, or scoped differently than the campus.
Counted in headline totals
Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
Primary source
Baxtel, February 2026
Last verified
, dataset version 2026-09-14. Re-checked at every data refresh.

Basis and confidence definitions are in the directory methodology.

What is known

Google's Project Mica, a second Kansas City campus in Clay County, confirmed in February 2026 with construction underway. The $10B figure is the Port KC revenue bond cap.

Location

Site
Clay County, MO
Coordinates
39.24, -94.57
State directory
Data centers in Missouri (16 verified facilities)

Other tracked projects in Missouri

Cite this record

Rein, Malachi (2026). Google Kansas City (Clay County, MO). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/google-kansas-city

@misc{malachienergy_google_kansas_city_2026,
  author = {Rein, Malachi},
  title = {Google Kansas City (Clay County, MO)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-09-14. Capacity basis: Press or analyst reported. Investment basis: Bond authorization cap.},
  url = {https://malachi.energy/data-centers/projects/google-kansas-city}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: bond authorization cap. Dataset version . Maintained by Malachi Rein for Malachi.Energy.