Meta Hyperion
Under ConstructionMeta · Richland Parish, LA
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Meta Hyperion in Richland Parish, LA is planned at 5.0 GW and about $50 billion, and is under construction, with a 2030 target as of September 2026. It ranks 5th of 54 tracked US mega projects by planned capacity, 4.6% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is high: both figures come from the developer or a filing and the site has physical progress or firm contracts. It is the only mega project Malachi.Energy tracks in Louisiana.
Key figures
5.0 GW
Developer disclosed
$50 billion
Developer-stated campus cost
Under construction
As of September 2026
2030
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Confidence
- High: both figures come from the developer or a filing and the site has physical progress or firm contracts.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- CNBC, July 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Meta's largest campus. Commitment raised in July 2026 from 2 GW and $27B to 5 GW and $50B+; roughly 2 GW expected by 2030 and the full campus around 2032.
Location
- Site
- Richland Parish, LA
- Coordinates
- 32.49, -91.63
- State directory
- Data centers in Louisiana (4 verified facilities)
Other tracked projects in Louisiana
This is the only mega project Malachi.Energy tracks in Louisiana.
Cite this record
Rein, Malachi (2026). Meta Hyperion (Richland Parish, LA). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/meta-hyperion
@misc{malachienergy_meta_hyperion_2026,
author = {Rein, Malachi},
title = {Meta Hyperion (Richland Parish, LA)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/meta-hyperion}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.