Monarch Data Center
ProposedCopia Power · Yerington, NV
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Monarch Data Center by Copia Power in Yerington, NV is planned at 1.0 GW and about $11 billion, and is proposed as of September 2026. It ranks 38th of 54 tracked US mega projects by planned capacity, 0.9% of the 109.2 GW national total. The capacity figure is utility, iso, or government filing; the investment figure is press reported. Confidence is low: the project is proposed without permits, or the capacity is an estimate. Malachi.Energy tracks 2 mega projects in Nevada in total.
Key figures
1.0 GW
Utility, ISO, or government filing
$11 billion
Press reported
Proposed
As of September 2026
Not stated
No public date
Where the figures come from
- Capacity basis
- Utility, ISO, or government filing
- Investment basis
- Press reported
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- KOLO, August 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Carlyle-backed 1 GW campus in Lyon County. County rezoning approved 3-1 in August 2026; tribal governments have said they will sue.
Location
- Site
- Yerington, NV
- Coordinates
- 38.98, -119.16
- State directory
- Data centers in Nevada (39 verified facilities)
Other tracked projects in Nevada
- Tract NevadaStorey County, NV, 2.0 GW, under construction
Cite this record
Rein, Malachi (2026). Monarch Data Center (Yerington, NV). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/copia-monarch-yerington-nv
@misc{malachienergy_copia_monarch_yerington_nv_2026,
author = {Rein, Malachi},
title = {Monarch Data Center (Yerington, NV)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Utility, ISO, or government filing. Investment basis: Press reported.},
url = {https://malachi.energy/data-centers/projects/copia-monarch-yerington-nv}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: utility, iso, or government filing. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.