Data Centers in Nevada

39 verified facilities · about 113 estimated ·

Nevada data centers at a glance

As of September 2026, Nevada has 39 data centers verified in OpenStreetMap and an estimated 113 in total. That ranks 12th among the 48 states and territories in the directory and is 2.2% of all verified US facilities. Facilities cluster in Las Vegas (5), McCarran (5), and Henderson (2). The largest operators by mapped sites are Switch (15), Flexential (2), and Google (2), out of 7 named operators. Malachi.Energy also tracks 2 mega projects in Nevada totaling 3.0 GW of planned capacity and about $111 billion in announced investment, led by Tract Nevada in Storey County, NV, 2.0 GW and about $100 billion, under construction, targeted for 2027.

Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Nevada electricity rates.

Verified

39

OSM-mapped facilities

Estimated

~113

Scaled to industry totals

Top hub

Las Vegas

5 verified facilities

Mega projects

3.0 GW

2 tracked, $111B announced

Map of data centers in Nevada

County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.

Data centers in NevadaMap of Nevada with county boundaries showing 39 verified facilities · 2 mega projects · 3 GW planned. Facilities from OpenStreetMap, mega projects from public filings, as of September 2026.Data centers in Nevada39 verified facilities · 2 mega projects · 3 GW plannedSwitch Las Vegas 7 · Switch · EnterpriseGoogle · Google · HendersonGoogle · Google · HendersonDataBank Las Vegas LAS1 · DataBank · Las VegasFiberhub LAS1 · Fiberhub · Las VegasFlexential Las Vegas - Downtown · Flexential · Las VegasSwitch Las Vegas 4 · Switch · Las VegasSwitch Las Vegas 5 · Switch · Las VegasTahoe Reno 1 · Switch · McCarranTahoe Reno 2 · Switch · McCarranTahoe Reno 3 · Switch · McCarranTahoe Reno 4 · Switch · McCarranTahoe Reno 5 · Switch · McCarranFlexential Las Vegas - North · Flexential · North Las VegasCenturyLink · Lumen TechnologiesCenturyLinkSwitch Edge 1Switch Las Vegas 10Switch Las Vegas 11 · SwitchSwitch Las Vegas 12Switch Las Vegas 14 · SwitchSwitch Las Vegas 8 · SwitchSwitch Las Vegas 9 · SwitchSwitch12 · SwitchVerizonVerizon North Las Vegas · VerizonUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data center · SwitchUnnamed data center · SwitchTract Nevada · 2 GW · Under constructionMonarch Data Center · 1 GW · ProposedVERIFIED FACILITIESData center mapped in OpenStreetMapMEGA PROJECTS BY STATUSOperatingUnder constructionAnnouncedProposedMARKER SIZE = PLANNED CAPACITY500 MW2 GW10 GWIN THIS FIGURE39 verified facilitiesTop hub: Las Vegas (5)Top operator: Switch2 mega projects, 3 GW$111B announced investmentSources: OpenStreetMap contributors (ODbL); mega projects from public filings and announcements, Malachi.Energy tally; boundaries US Census via us-atlas.malachi.energy/data-centers/nevada · Data updated September 2026

Top operators in Nevada

By OSM-verified facility count

  1. 1.Switch15
  2. 2.Flexential2
  3. 3.Google2
  4. 4.DataBank1
  5. 5.Fiberhub1

Key hubs in Nevada

Cities with the most verified facilities

  1. 1.Las Vegas5
  2. 2.McCarran5
  3. 3.Henderson2
  4. 4.Enterprise1
  5. 5.North Las Vegas1

Mega projects in Nevada

2 tracked projects · 3.0 GW planned capacity · $111B announced

Tract Nevada (Storey County, NV)

Tract

Under Construction
2,000 MW$100B

Tract's $100B, 10-year development across 11,000+ acres at Tahoe Reno Industrial Center. The $4.6B South Valley building broke ground in May 2026; first power expected around early 2027. NV Energy sued Tract in July 2026 over the 2 GW supply obligation.

Target: 2027Source: KOLO (May 2026)

Monarch Data Center (Yerington, NV)

Copia Power

Proposed
1,000 MW$11B

Carlyle-backed 1 GW campus in Lyon County. County rezoning approved 3-1 in August 2026; tribal governments have said they will sue.

Source: KOLO (Aug 2026)

All verified data centers in Nevada

39 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.

OSM-verified data center facilities in Nevada
NameOperatorCityAddress
Switch Las Vegas 7SwitchEnterprise7135 South Decatur Boulevard
GoogleGoogleHenderson540 West Warm Springs Road
GoogleGoogleHenderson560 West Warm Springs Road
DataBank Las Vegas LAS1DataBankLas Vegas7185 Pollock Drive
Fiberhub LAS1FiberhubLas Vegas1110 Palms Airport Drive
Flexential Las Vegas - DowntownFlexentialLas Vegas304 East Carson Avenue
Switch Las Vegas 4SwitchLas Vegas4495 East Sahara Avenue
Switch Las Vegas 5SwitchLas Vegas4489 East Sahara Avenue
Tahoe Reno 1SwitchMcCarran1 Superloop Circle
Tahoe Reno 2SwitchMcCarran1 Superloop Circle
Tahoe Reno 3SwitchMcCarran1 Superloop Circle
Tahoe Reno 4SwitchMcCarran1 Superloop Circle
Tahoe Reno 5SwitchMcCarran1 Superloop Circle
Flexential Las Vegas - NorthFlexentialNorth Las Vegas3330 East Lone Mountain Road
CenturyLinkLumen TechnologiesUnknownNot listed
CenturyLinkUnknownUnknownNot listed
Switch Edge 1UnknownUnknownNot listed
Switch Las Vegas 10UnknownUnknownNot listed
Switch Las Vegas 11SwitchUnknownNot listed
Switch Las Vegas 12UnknownUnknownNot listed
Switch Las Vegas 14SwitchUnknownNot listed
Switch Las Vegas 8SwitchUnknownNot listed
Switch Las Vegas 9SwitchUnknownNot listed
Switch12SwitchUnknownNot listed
VerizonUnknownUnknownNot listed
Verizon North Las VegasVerizonUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilitySwitchUnknownNot listed
Unnamed facilitySwitchUnknownNot listed

Frequently asked questions

How many data centers are in Nevada?

Nevada has 39 data centers verified in OpenStreetMap as of September 2026, and an estimated 113 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 12th of 48 states and territories by verified count.

Where are the data centers in Nevada?

The largest concentrations in Nevada are Las Vegas with 5 verified facilities, McCarran with 5 verified facilities, Henderson with 2 verified facilities, Enterprise with 1 verified facility, and North Las Vegas with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.

Who operates the most data centers in Nevada?

By number of OSM-verified facilities, the largest data center operators in Nevada are Switch (15), Flexential (2), Google (2), DataBank (1), and Fiberhub (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.

What large data centers are being built in Nevada?

Malachi.Energy tracks 2 mega projects in Nevada as of September 2026: Tract Nevada in Storey County, NV, 2.0 GW and about $100 billion, under construction, targeted for 2027 and Monarch Data Center (Copia Power) in Yerington, NV, 1.0 GW and about $11 billion, proposed. Together they total 3.0 GW of planned capacity and about $111 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.

All US data centers

Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.