Data Centers in Nevada
39 verified facilities · about 113 estimated ·
Nevada data centers at a glance
As of September 2026, Nevada has 39 data centers verified in OpenStreetMap and an estimated 113 in total. That ranks 12th among the 48 states and territories in the directory and is 2.2% of all verified US facilities. Facilities cluster in Las Vegas (5), McCarran (5), and Henderson (2). The largest operators by mapped sites are Switch (15), Flexential (2), and Google (2), out of 7 named operators. Malachi.Energy also tracks 2 mega projects in Nevada totaling 3.0 GW of planned capacity and about $111 billion in announced investment, led by Tract Nevada in Storey County, NV, 2.0 GW and about $100 billion, under construction, targeted for 2027.
Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Nevada electricity rates.
Verified
39
OSM-mapped facilities
Estimated
~113
Scaled to industry totals
Top hub
Las Vegas
5 verified facilities
Mega projects
3.0 GW
2 tracked, $111B announced
Map of data centers in Nevada
County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.
Top operators in Nevada
By OSM-verified facility count
- 1.Switch15
- 2.Flexential2
- 3.Google2
- 4.DataBank1
- 5.Fiberhub1
Key hubs in Nevada
Cities with the most verified facilities
- 1.Las Vegas5
- 2.McCarran5
- 3.Henderson2
- 4.Enterprise1
- 5.North Las Vegas1
Mega projects in Nevada
2 tracked projects · 3.0 GW planned capacity · $111B announced
Tract Nevada (Storey County, NV)
Tract
Tract's $100B, 10-year development across 11,000+ acres at Tahoe Reno Industrial Center. The $4.6B South Valley building broke ground in May 2026; first power expected around early 2027. NV Energy sued Tract in July 2026 over the 2 GW supply obligation.
Target: 2027Source: KOLO (May 2026)
Monarch Data Center (Yerington, NV)
Copia Power
Carlyle-backed 1 GW campus in Lyon County. County rezoning approved 3-1 in August 2026; tribal governments have said they will sue.
Source: KOLO (Aug 2026)
All verified data centers in Nevada
39 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.
| Name | Operator | City | Address |
|---|---|---|---|
| Switch Las Vegas 7 | Switch | Enterprise | 7135 South Decatur Boulevard |
| Henderson | 540 West Warm Springs Road | ||
| Henderson | 560 West Warm Springs Road | ||
| DataBank Las Vegas LAS1 | DataBank | Las Vegas | 7185 Pollock Drive |
| Fiberhub LAS1 | Fiberhub | Las Vegas | 1110 Palms Airport Drive |
| Flexential Las Vegas - Downtown | Flexential | Las Vegas | 304 East Carson Avenue |
| Switch Las Vegas 4 | Switch | Las Vegas | 4495 East Sahara Avenue |
| Switch Las Vegas 5 | Switch | Las Vegas | 4489 East Sahara Avenue |
| Tahoe Reno 1 | Switch | McCarran | 1 Superloop Circle |
| Tahoe Reno 2 | Switch | McCarran | 1 Superloop Circle |
| Tahoe Reno 3 | Switch | McCarran | 1 Superloop Circle |
| Tahoe Reno 4 | Switch | McCarran | 1 Superloop Circle |
| Tahoe Reno 5 | Switch | McCarran | 1 Superloop Circle |
| Flexential Las Vegas - North | Flexential | North Las Vegas | 3330 East Lone Mountain Road |
| CenturyLink | Lumen Technologies | Unknown | Not listed |
| CenturyLink | Unknown | Unknown | Not listed |
| Switch Edge 1 | Unknown | Unknown | Not listed |
| Switch Las Vegas 10 | Unknown | Unknown | Not listed |
| Switch Las Vegas 11 | Switch | Unknown | Not listed |
| Switch Las Vegas 12 | Unknown | Unknown | Not listed |
| Switch Las Vegas 14 | Switch | Unknown | Not listed |
| Switch Las Vegas 8 | Switch | Unknown | Not listed |
| Switch Las Vegas 9 | Switch | Unknown | Not listed |
| Switch12 | Switch | Unknown | Not listed |
| Verizon | Unknown | Unknown | Not listed |
| Verizon North Las Vegas | Verizon | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Switch | Unknown | Not listed |
| Unnamed facility | Switch | Unknown | Not listed |
Frequently asked questions
How many data centers are in Nevada?
Nevada has 39 data centers verified in OpenStreetMap as of September 2026, and an estimated 113 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 12th of 48 states and territories by verified count.
Where are the data centers in Nevada?
The largest concentrations in Nevada are Las Vegas with 5 verified facilities, McCarran with 5 verified facilities, Henderson with 2 verified facilities, Enterprise with 1 verified facility, and North Las Vegas with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.
Who operates the most data centers in Nevada?
By number of OSM-verified facilities, the largest data center operators in Nevada are Switch (15), Flexential (2), Google (2), DataBank (1), and Fiberhub (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.
What large data centers are being built in Nevada?
Malachi.Energy tracks 2 mega projects in Nevada as of September 2026: Tract Nevada in Storey County, NV, 2.0 GW and about $100 billion, under construction, targeted for 2027 and Monarch Data Center (Copia Power) in Yerington, NV, 1.0 GW and about $11 billion, proposed. Together they total 3.0 GW of planned capacity and about $111 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.
Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.