Data Centers in Texas

215 verified facilities · about 779 estimated ·

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Texas data centers at a glance

As of October 2026, Texas has 215 data centers verified in OpenStreetMap and an estimated 779 in total. That ranks 2nd among the 48 states and territories in the directory and is 12.1% of all verified US facilities. Facilities cluster in San Antonio (15), Dallas (12), and Richardson (10). The largest operators by mapped sites are Microsoft (14), CyrusOne (9), and Digital Realty (8), out of 39 named operators. Malachi.Energy also tracks 12 mega projects in Texas totaling 36.0 GW of planned capacity and about $218 billion in announced investment, led by Advanced Energy Campus (Fermi America) in Carson County, TX, 17.0 GW and about $50 billion, announced, targeted for 2027. Of the 10 tracked projects in Texas with a site-level location, 8 sit within 5 miles of a 230 kV or higher transmission line, per HIFLD transmission data current to September 2023, computed 2026-10-02.

Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Texas electricity rates.

Verified

215

OSM-mapped facilities

Estimated

~779

Scaled to industry totals

Top hub

San Antonio

15 verified facilities

Mega projects

36.0 GW

12 tracked, $218B announced

Map of data centers in Texas

County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.

Data centers in TexasMap of Texas with county boundaries showing 215 verified facilities · 12 mega projects · 36 GW planned. Facilities from OpenStreetMap, mega projects from public filings, as of October 2026.Data centers in Texas215 verified facilities · 12 mega projects · 36 GW plannedUnnamed data center · AbileneUnnamed data center · AbileneEvoque Allen DA1 · Centersquare · AllenUnnamed data center · AllenUnnamed data center · TierPoint · AllenUnnamed data center · ScaleMatrix · AllenUnnamed data center · CyrusOne · AllenUnnamed data center · CyrusOne · AllenAlpheus DataCenter · Alpheus · AustinData Foundry - Texas 1 · AustinData Foundry - Texas 2 · AustinDigital Realty Austin AUS11 · AustinLightEdge Austin II · AustinUnnamed data center · CyrusOne · AustinUnnamed data center · CyrusOne · AustinCoreSpace Dallas · CoreSpace · DallasDataBank · DallasDataBank Dallas Empire Central Data Center · DataBank · DallasEquinix Infomart · Equinix · DallasFlexential Dallas - Downtown Dallas · Flexential · DallasLive Oak Data Center · DallasLumen Dallas - 3180 Irving Blvd. · Lumen Technologies · DallasPrime DFW01-01 · Prime · DallasPrime DFW01-01 · Prime · DallasRad Web Hosting · DallasTierPoint Dallas Data Center · TierPoint · DallasVIRTBIZ · DallasMDC · El PasoAmazon Web Services · Amazon Web Services · EulessNovartis · Fort WorthQTS Data Center · Quality Technology Services · Fort WorthUnnamed data center · CyrusOne · Fort WorthNTT · NTT · GarlandStream Data Centers DFWA · Stream Data Centers · GarlandMARA Data Center · Marathon Digital Holdings · GranburyData Foundry · HoustonRice Data Center · HoustonUnnamed data center · DXC Technology · HoustonQTS Irving - Dallas Data Center Campus · Quality Technology Services · IrvingSkybox Houston One · Skybox · KatyPrecision Prints Lufkin Datacenter · LufkinAlinged Data Center DFW-03 · Aligned Data Centers, LLC · MansfieldGoogle · Google · MidlothianThin-nology · PflugervilleAligned DFW-01 · Aligned · PlanoAligned DFW-02 · Aligned · PlanoAligned Data Centers DFW-04 · Aligned Data Centers · PlanoDataBank Plano Data Center · DataBank · PlanoFlexential Dallas - Plano · Flexential · PlanoCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakCompass Data Center · Red OakGoogle · Google · Red OakDigital Realty Dallas DFW16 · Digital Realty · RichardsonDigital Realty Dallas DFW17 · Digital Realty · RichardsonDigital Realty Dallas DFW18 · Digital Realty · RichardsonDigital Realty Dallas DFW28 · Digital Realty · RichardsonDigital Realty Dallas DFW29 · Digital Realty · RichardsonDigital Realty Dallas DFW35 · Digital Realty · RichardsonFlexential Dallas - Richardson · Flexential · RichardsonRackspace Richardson DFW3 · Rackspace · RichardsonStream DFW IV · Stream · RichardsonUnnamed data center · RichardsonCITIGROUP TECHNOLOGY INC · RoanokeSwitch: The Rock · Switch · Round RockAmazon AWS SAT - 12807 Donop · Amazon Web Services · San AntonioCyrusOne San Antonio I · CyrusOne · San AntonioGVTC · GVTC · San AntonioH5 Data Centers San Antonio · H5 Data Centers · San AntonioLowe's Data Center · Lowe's · San AntonioLumen San Antonio 2 · Lumen Technologies · San AntonioMicrosoft · Microsoft · San AntonioMicrosoft · Microsoft · San AntonioMicrosoft · Microsoft · San AntonioMicrosoft San Antonio · Microsoft · San AntonioMicrosoft SAT 80 · Microsoft · San AntonioMicrosoft SAT 81 · Microsoft · San AntonioMicrosoft SAT 82 · Microsoft · San AntonioQTS San Antonio II · Quality Technology Services · San AntonioStream San Antonio II · San AntonioTexas Cryptologic Center · National Security Agency · San AntonioValero Wiserman · Valero · San AntonioVantage Data Centers TX21 · Vantage Data Centers · San AntonioVantage Data Centers TX22 · Vantage Data Centers · San AntonioVantage TX11 · Vantage Data Centers · San AntonioVantage TX12 · Vantage Data Centers · San AntonioVantage TX12 · Vantage Data Centers · San AntonioUnnamed data center · CHRISTUS Health · San AntonioUnnamed data center · Frost Bank · San AntonioUnnamed data center · HEB · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioUnnamed data center · San AntonioVerizon Wireless Mew Building · SouthlakeUnnamed data center · TempleUnnamed data center · TempleStream Data Centers Houston · The WoodlandsUnnamed data center · Wichita FallsAmazonArgo Data CenterCharles Schwab Data CenterCisco AllenCortex supercomputerCyrusOne San Antonio II · CyrusOneCyrusOne San Antonio III · CyrusOneCyrusOne San Antonio IVCyrusOne SAT10 & SAT11 · CyrusOneCyxtera Dallas-Fort Worth Data Center · CyxteraData Foundry Austin 1 Data CenterDigital Realty · Digital RealtyDigital Realty · Digital RealtyElement CriticalExperian McKinney Data CenterFacebook Fort Worth Datacenter · MetaFacebook Fort Worth Datacenter · MetaFacebook Fort Worth Datacenter · MetaGoogle · GoogleGoogle · GoogleIONIC Digital Cedarvale · IONIC DigitalLightEdge Austin ILumen Austin 1Lumen Austin 3 · Lumen TechnologiesLumen Dallas 6 · Lumen TechnologiesMicrosoft · MicrosoftMicrosoft · MicrosoftMicrosoft · MicrosoftMicrosoft Texas Research Park Campus · MicrosoftMicrosoft TRP1 · MicrosoftMicrosoft TRP2 · MicrosoftMicrosoft TRP3 (SAT46) · MicrosoftNTT · NTTNTT · NTTNTT · NTTVantage San Antonio I · Vantage Data CentersUnnamed data center · DXC TechnologyUnnamed data center · DXC TechnologyUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerAdvanced Energy Campus (Fermi America) · 17 GW · AnnouncedData City Texas · 5 GW · ProposedMatrix Data Center Campus · 3 GW · Under constructionGoogle Texas Expansion · 2 GW · Under constructionMicrosoft Pecos (Project Kilby) · 2 GW · AnnouncedVantage Frontier · 1.4 GW · Under constructionStargate · 1.2 GW · OperatingStargate Milam County · 1.2 GW · Under constructionMeta El Paso · 1 GW · Under constructionGalaxy Digital Helios · 800 MW · OperatingCyrusOne Freestone County · 760 MW · Under constructionNexus Hubbard (Anthropic) · 600 MW · Under constructionVERIFIED FACILITIESData center mapped in OpenStreetMapMEGA PROJECTS BY STATUSOperatingUnder constructionAnnouncedProposedMARKER SIZE = PLANNED CAPACITY500 MW2 GW10 GWIN THIS FIGURE215 verified facilitiesTop hub: San Antonio (15)Top operator: Microsoft12 mega projects, 36 GW$217.9B announced investmentSources: OpenStreetMap contributors (ODbL); mega projects from public filings and announcements, Malachi.Energy tally; boundaries US Census via us-atlas.malachi.energy/data-centers/texas · Data updated October 2026

Top operators in Texas

By OSM-verified facility count

  1. 1.Microsoft14
  2. 2.CyrusOne9
  3. 3.Digital Realty8
  4. 4.Vantage Data Centers6
  5. 5.Google4

Key hubs in Texas

Cities with the most verified facilities

  1. 1.San Antonio15
  2. 2.Dallas12
  3. 3.Richardson10
  4. 4.Austin7
  5. 5.Allen6

Mega projects in Texas

12 tracked projects · 36.0 GW planned capacity · $217.9B announced

Advanced Energy Campus (Fermi America) (Carson County, TX)

Fermi America

Announced
17,000 MW$50B

Project Matador, the Texas panhandle campus now marketed at 17 GW with roughly 6 GW permitted. TensorWave signed a 15-year, $6.5B lease for the first 222 MW building in August 2026, with deliveries staged for the second half of 2027. Satellite imagery through spring 2026 showed land clearing, not vertical construction.

Target: 2027Source: Bisnow (Aug 2026)Basis: developer disclosed MW, press reportedDetails & sources

Data City Texas (Laredo, TX)

Energy Abundance Development

Proposed
5,000 MW$10B

Proposed 5 GW behind-the-meter data center hub near Laredo, billed as the world's largest. Commercial operations targeted for 2029; no permits, tenants, or construction reported.

Target: 2029Source: RGV Business Journal (Feb 2026)Basis: developer disclosed MW, press reportedDetails & sources

Matrix Data Center Campus (Sulphur Springs, TX)

MSB Global Services

Under Construction
3,000 MW$18.7B

3 GW campus in Hopkins County that broke ground in February 2025; Phase I is 800 MW with the first building targeted for late 2026 and full build by 2029.

Target: 2029Source: Gilmer Mirror (Feb 2026)Basis: developer disclosed MW, developer-stated campus costDetails & sources

Google Texas Expansion (Haskell County, TX)

Google

Under Construction
2,000 MW$40B

Google's $40B Texas expansion. Two Haskell County campuses are under construction, and a third Google-linked campus in Ranger received a county tax abatement in April 2026. No megawatt figure has been published.

Target: 2027Source: KTXS (May 2026)Basis: malachi.energy estimate MW, multi-site or statewide commitmentDetails & sources

Microsoft Pecos (Project Kilby) (Pecos, TX)

Microsoft / Chevron

Announced
2,000 MW$8B

2,000-acre behind-the-meter AI campus with a 20-year Chevron gas supply deal (June 2026) and no ERCOT interconnect; final investment decision due by end of 2026. The $8B is the midpoint of Chevron's power plant capex; campus cost is undisclosed.

Target: 2028Source: Chevron (Jun 2026)Basis: press or analyst reported MW, on-site power plant cost onlyDetails & sources

Vantage Frontier (Albany, TX)

Vantage Data Centers

Under Construction
1,400 MW$25B

Vantage Data Centers' massive West Texas campus near Abilene, part of the emerging Texas data center corridor.

Target: 2026Source: Epoch AI (Apr 2026)Basis: developer disclosed MW, developer-stated campus costDetails & sources

Stargate (Abilene, TX)

OpenAI / SoftBank / Oracle

Operational
1,200 MW$32B

OpenAI's flagship Stargate campus. Buildings 1-4 serving about 420 MW of IT load as of September 2026, buildings 5-8 structurally complete, full 1.2 GW projected by late 2026. A 600 MW expansion was scrapped in March 2026. Investment is Epoch AI's projected site cost at full buildout; the $100B figure often quoted is the program-wide Stargate commitment.

Target: 2026Source: Epoch AI (Sep 2026)Basis: developer disclosed MW, third-party analyst estimateDetails & sources

Stargate Milam County (Milam County, TX)

SB Energy / OpenAI

Under Construction
1,200 MW$1B

SB Energy-operated Stargate campus in central Texas. Building 1 framed, first delivery targeted for October 2026, full 1.2 GW by Q4 2028.

Target: 2026Source: Epoch AI (Apr 2026)Basis: developer disclosed MW, third-party analyst estimateDetails & sources

Meta El Paso (El Paso, TX)

Meta / BlackRock

Under Construction
1,000 MW$14B

Meta's 1 GW far west Texas campus, raised to a $10B+ commitment from Meta in March 2026, with about $14B in total development costs for the buildings and supporting power, cooling, and connectivity infrastructure. A BlackRock-led venture took an 80% stake in July 2026; more than 2,300 workers on site, with capacity coming online from 2028.

Target: 2028Source: Meta (Jul 2026)Basis: developer disclosed MW, developer-stated campus costDetails & sources

Galaxy Digital Helios (Dickens County, TX)

Galaxy Digital

Operational
800 MW$1.7B

Galaxy Digital's Helios campus delivered Phase I (133 MW of IT load, a $1.7B build) to CoreWeave in Q2 2026, with Phase II (260 MW) due from the first half of 2027. CoreWeave has committed to the campus's original 800 MW of approved power; ERCOT approved another 830 MW in January 2026 for a total of 1.63 GW, with no tenant yet for the addition.

Target: 2026Source: Galaxy, SEC 8-K (Oct 2025)Basis: developer disclosed MW, developer-stated first-phase costDetails & sources

CyrusOne Freestone County (Freestone County, TX)

CyrusOne / Calpine

Under Construction
760 MW$1.5B

CyrusOne's two-phase 760 MW campus co-located with Calpine generation broke ground in June 2026. First building targeted for Q4 2026; $1.5B covers the first three buildings.

Target: 2026Source: Freestone County Times (Jun 2026)Basis: developer disclosed MW, developer-stated first-phase costDetails & sources

Nexus Hubbard (Anthropic) (Hubbard, TX)

Nexus Data Centers / Google

Under Construction
600 MW$16B

Google-backed campus for Anthropic in Hill County, up to 600 MW in its first phase with a developer target of 7.7 GW. Nexus reached a final investment decision in August 2026 on a roughly $16B project finance package for that phase; the first building has been under construction since January 2026 and is due in October 2027.

Target: 2027Source: W.Media (Aug 2026)Basis: press or analyst reported MW, press reportedDetails & sources

All verified data centers in Texas

215 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.

OSM-verified data center facilities in Texas
NameOperatorCityAddress
Unnamed facilityUnknownAbilene251 Lancium Wy (address point)
Unnamed facilityUnknownAbilene351 Lancium Wy (address point)
Evoque Allen DA1CentersquareAllen900 Guardians Way
Unnamed facilityUnknownAllen800 Guardians Way
Unnamed facilityTierPointAllen820 Allen Commerce Parkway
Unnamed facilityScaleMatrixAllen820 Allen Commerce Parkway
Unnamed facilityCyrusOneAllen2300 Chelsea Boulevard
Unnamed facilityCyrusOneAllen2300 Chelsea Boulevard
Alpheus DataCenterAlpheusAustin1905 East 6th Street
Data Foundry - Texas 1UnknownAustin4100 Smith School Road
Data Foundry - Texas 2UnknownAustin4100 Smith School Road
Digital Realty Austin AUS11UnknownAustin7500 Metro Center Drive
LightEdge Austin IIUnknownAustin7000B Burleson Road
Unnamed facilityCyrusOneAustin7301 Metropolis Drive
Unnamed facilityCyrusOneAustin7100 Metropolis Drive
CoreSpace DallasCoreSpaceDallas7505 John W Carpenter Freeway
DataBankUnknownDallas400 South Akard Street
DataBank Dallas Empire Central Data CenterDataBankDallas1100 Empire Central Place
Equinix InfomartEquinixDallas1950 North Stemmons Freeway
Flexential Dallas - Downtown DallasFlexentialDallas1950 North Stemmons Freeway
Live Oak Data CenterUnknownDallas2020 Live Oak Street
Lumen Dallas - 3180 Irving Blvd.Lumen TechnologiesDallas3180 Irving Boulevard
Prime DFW01-01PrimeDallas1515 Round Table Drive
Prime DFW01-01PrimeDallas1515 Round Table Drive
Rad Web HostingUnknownDallas400 South Akard Street
TierPoint Dallas Data CenterTierPointDallas3004 Irving Boulevard
VIRTBIZUnknownDallas2805 Canton Street
MDCUnknownEl Paso11455 Cedar Oak Drive
Amazon Web ServicesAmazon Web ServicesEuless1001 Bear Creek Parkway (address point)
NovartisUnknownFort Worth6551 South Freeway (address point)
QTS Data CenterQuality Technology ServicesFort Worth14100 Park Vista Boulevard (address point)
Unnamed facilityCyrusOneFort Worth9501 Ashphalt Road
NTTNTTGarland2080 Lookout Drive (address point)
Stream Data Centers DFWAStream Data CentersGarland1813 Lookout Drive
MARA Data CenterMarathon Digital HoldingsGranbury2001 Mitchell Bend Highway
Data FoundryUnknownHouston660 Greens Parkway (address point)
Rice Data CenterUnknownHouston1160 Main Street
Unnamed facilityDXC TechnologyHouston15555 Cutten Road (address point)
QTS Irving - Dallas Data Center CampusQuality Technology ServicesIrving6431 Longhorn Drive
Skybox Houston OneSkyboxKaty22000 Franz Road (address point)
Precision Prints Lufkin DatacenterUnknownLufkin1602 Brentwood Drive (address point)
Alinged Data Center DFW-03Aligned Data Centers, LLCMansfield3801 Britton Road
GoogleGoogleMidlothian3441 Railport Parkway (address point)
Thin-nologyUnknownPflugerville3804 Helios Way
Aligned DFW-01AlignedPlano2800 Summit Avenue
Aligned DFW-02AlignedPlano2800 Summit Avenue
Aligned Data Centers DFW-04Aligned Data CentersPlano401 North Star Road
DataBank Plano Data CenterDataBankPlano8375 Dominion Parkway
Flexential Dallas - PlanoFlexentialPlano3500 East Plano Parkway
Compass Data CenterUnknownRed Oak300 Houston School Road
Compass Data CenterUnknownRed Oak581 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak541 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak501 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak481 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak441 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak500 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak540 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak580 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak550 North Austin Boulevard (address point)
Compass Data CenterUnknownRed Oak590 North Austin Boulevard (address point)
GoogleGoogleRed Oak330 North Austin Boulevard (address point)
Digital Realty Dallas DFW16Digital RealtyRichardson1232 Alma Road
Digital Realty Dallas DFW17Digital RealtyRichardson900 Quality Way
Digital Realty Dallas DFW18Digital RealtyRichardson1210 Integrity Drive
Digital Realty Dallas DFW28Digital RealtyRichardson850 East Collins Boulevard
Digital Realty Dallas DFW29Digital RealtyRichardson950 East Collins Boulevard
Digital Realty Dallas DFW35Digital RealtyRichardson907 Security Row
Flexential Dallas - RichardsonFlexentialRichardson3010 Waterview Parkway
Rackspace Richardson DFW3RackspaceRichardson1215 Integrity Drive
Stream DFW IVStreamRichardson3300 Essex Drive
Unnamed facilityUnknownRichardson904 Quality Way
CITIGROUP TECHNOLOGY INCUnknownRoanoke931 Litsey Road (address point)
Switch: The RockSwitchRound Rock150 Dell Way (address point)
Amazon AWS SAT - 12807 DonopAmazon Web ServicesSan Antonio12807 Donop Road (address point)
CyrusOne San Antonio ICyrusOneSan Antonio9999 Westover Hills Boulevard
GVTCGVTCSan Antonio25854 Overlook Parkway (address point)
H5 Data Centers San AntonioH5 Data CentersSan Antonio100 Taylor Street
Lowe's Data CenterLowe'sSan Antonio10045 Rogers Run (address point)
Lumen San Antonio 2Lumen TechnologiesSan Antonio1203 North Frio Street (address point)
MicrosoftMicrosoftSan Antonio3823 Wiseman Boulevard
MicrosoftMicrosoftSan Antonio5200 Rogers Road
MicrosoftMicrosoftSan Antonio15452 Omicron Drive (address point)
Microsoft San AntonioMicrosoftSan Antonio5150 Rogers Road
Microsoft SAT 80MicrosoftSan Antonio18844 FM1957
Microsoft SAT 81MicrosoftSan Antonio18844 FM1957
Microsoft SAT 82MicrosoftSan Antonio18844 FM1957
QTS San Antonio IIQuality Technology ServicesSan Antonio8635 Potranco Road
Stream San Antonio IIUnknownSan Antonio9550 Westover Hills Boulevard (address point)
Texas Cryptologic CenterNational Security AgencySan Antonio7700 Potranco Road (address point)
Valero WisermanValeroSan Antonio3535 Wiseman Boulevard (address point)
Vantage Data Centers TX21Vantage Data CentersSan Antonio5207 Rogers Road
Vantage Data Centers TX22Vantage Data CentersSan Antonio5207 Rogers Road
Vantage TX11Vantage Data CentersSan Antonio14720 Omicron Drive
Vantage TX12Vantage Data CentersSan Antonio14720 Omicron Drive
Vantage TX12Vantage Data CentersSan Antonio14720 Omicron Drive
Unnamed facilityCHRISTUS HealthSan Antonio10002 Rogers Run (address point)
Unnamed facilityFrost BankSan Antonio10010 Rogers Run (address point)
Unnamed facilityHEBSan Antonio15103 Huebner Road
Unnamed facilityUnknownSan Antonio11203 Military Drive West (address point)
Unnamed facilityUnknownSan Antonio1707 West Loop 1604 North (address point)
Unnamed facilityUnknownSan Antonio14677 Omicron Drive (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Unnamed facilityUnknownSan Antonio1050 Democracy (address point)
Verizon Wireless Mew BuildingUnknownSouthlake500 West Dove Road (address point)
Unnamed facilityUnknownTemple3101 BLD A Industrial Boulevard (address point)
Unnamed facilityUnknownTemple3101 BLD B Industrial Boulevard (address point)
Stream Data Centers HoustonUnknownThe Woodlands4001 Technology Forest Boulevard
Unnamed facilityUnknownWichita Falls2236 Airport Drive
AmazonUnknownUnknownNot listed
Argo Data CenterUnknownUnknownNot listed
Charles Schwab Data CenterUnknownUnknownNot listed
Cisco AllenUnknownUnknown2260 Chelsea Boulevard
Cortex supercomputerUnknownUnknownNot listed
CyrusOne San Antonio IICyrusOneUnknownNot listed
CyrusOne San Antonio IIICyrusOneUnknownNot listed
CyrusOne San Antonio IVUnknownUnknownNot listed
CyrusOne SAT10 & SAT11CyrusOneUnknownNot listed
Cyxtera Dallas-Fort Worth Data CenterCyxteraUnknown14950 Kingsport Road
Data Foundry Austin 1 Data CenterUnknownUnknown7401 East Ben White Boulevard
Digital RealtyDigital RealtyUnknown1505 Ferris Road
Digital RealtyDigital RealtyUnknownNot listed
Element CriticalUnknownUnknown8025 North Interstate Highway 35 Service Road
Experian McKinney Data CenterUnknownUnknown3400 South Stonebridge Drive
Facebook Fort Worth DatacenterMetaUnknown4500 Like Way
Facebook Fort Worth DatacenterMetaUnknownNot listed
Facebook Fort Worth DatacenterMetaUnknownNot listed
GoogleGoogleUnknownNot listed
GoogleGoogleUnknownNot listed
IONIC Digital CedarvaleIONIC DigitalUnknownNot listed
LightEdge Austin IUnknownUnknown2916 Montopolis Drive
Lumen Austin 1UnknownUnknown4209 Smith School Road
Lumen Austin 3Lumen TechnologiesUnknownNot listed
Lumen Dallas 6Lumen TechnologiesUnknown1150 Regal Row
MicrosoftMicrosoftUnknownNot listed
MicrosoftMicrosoftUnknownNot listed
MicrosoftMicrosoftUnknownNot listed
Microsoft Texas Research Park CampusMicrosoftUnknownNot listed
Microsoft TRP1MicrosoftUnknownNot listed
Microsoft TRP2MicrosoftUnknownNot listed
Microsoft TRP3 (SAT46)MicrosoftUnknownNot listed
NTTNTTUnknownNot listed
NTTNTTUnknownNot listed
NTTNTTUnknownNot listed
Vantage San Antonio IVantage Data CentersUnknownNot listed
Unnamed facilityDXC TechnologyUnknownNot listed
Unnamed facilityDXC TechnologyUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed

Frequently asked questions

How many data centers are in Texas?

Texas has 215 data centers verified in OpenStreetMap as of October 2026, and an estimated 779 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 2nd of 48 states and territories by verified count.

Where are the data centers in Texas?

The largest concentrations in Texas are San Antonio with 15 verified facilities, Dallas with 12 verified facilities, Richardson with 10 verified facilities, Austin with 7 verified facilities, and Allen with 6 verified facilities. The full table below lists every verified facility in the state with its operator and address.

Who operates the most data centers in Texas?

By number of OSM-verified facilities, the largest data center operators in Texas are Microsoft (14), CyrusOne (9), Digital Realty (8), Vantage Data Centers (6), and Google (4). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.

What large data centers are being built in Texas?

Malachi.Energy tracks 12 mega projects in Texas as of October 2026: Advanced Energy Campus (Fermi America) in Carson County, TX, 17.0 GW and about $50 billion, announced, targeted for 2027; Data City Texas (Energy Abundance Development) in Laredo, TX, 5.0 GW and about $10 billion, proposed, targeted for 2029; Matrix Data Center Campus (MSB Global Services) in Sulphur Springs, TX, 3.0 GW and about $19 billion, under construction, targeted for 2029; Google Texas Expansion in Haskell County, TX, 2.0 GW and about $40 billion, under construction, targeted for 2027; Microsoft Pecos (Project Kilby) (Microsoft / Chevron) in Pecos, TX, 2.0 GW and about $8 billion, announced, targeted for 2028; Vantage Frontier (Vantage Data Centers) in Albany, TX, 1.4 GW and about $25 billion, under construction, targeted for 2026; Stargate (OpenAI / SoftBank / Oracle) in Abilene, TX, 1.2 GW and about $32 billion, operational, targeted for 2026; Stargate Milam County (SB Energy / OpenAI) in Milam County, TX, 1.2 GW and about $1 billion, under construction, targeted for 2026; Meta El Paso (Meta / BlackRock) in El Paso, TX, 1.0 GW and about $14 billion, under construction, targeted for 2028; Galaxy Digital Helios in Dickens County, TX, 800 MW and about $2 billion, operational, targeted for 2026; CyrusOne Freestone County (CyrusOne / Calpine) in Freestone County, TX, 760 MW and about $2 billion, under construction, targeted for 2026; and Nexus Hubbard (Anthropic) (Nexus Data Centers / Google) in Hubbard, TX, 600 MW and about $16 billion, under construction, targeted for 2027. Together they total 36.0 GW of planned capacity and about $218 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.

All US data centers

Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.