Data Centers in Texas
215 verified facilities · about 779 estimated ·
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Texas data centers at a glance
As of October 2026, Texas has 215 data centers verified in OpenStreetMap and an estimated 779 in total. That ranks 2nd among the 48 states and territories in the directory and is 12.1% of all verified US facilities. Facilities cluster in San Antonio (15), Dallas (12), and Richardson (10). The largest operators by mapped sites are Microsoft (14), CyrusOne (9), and Digital Realty (8), out of 39 named operators. Malachi.Energy also tracks 12 mega projects in Texas totaling 36.0 GW of planned capacity and about $218 billion in announced investment, led by Advanced Energy Campus (Fermi America) in Carson County, TX, 17.0 GW and about $50 billion, announced, targeted for 2027. Of the 10 tracked projects in Texas with a site-level location, 8 sit within 5 miles of a 230 kV or higher transmission line, per HIFLD transmission data current to September 2023, computed 2026-10-02.
Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Texas electricity rates.
Verified
215
OSM-mapped facilities
Estimated
~779
Scaled to industry totals
Top hub
San Antonio
15 verified facilities
Mega projects
36.0 GW
12 tracked, $218B announced
Map of data centers in Texas
County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.
Top operators in Texas
By OSM-verified facility count
- 1.Microsoft14
- 2.CyrusOne9
- 3.Digital Realty8
- 4.Vantage Data Centers6
- 5.Google4
Key hubs in Texas
Cities with the most verified facilities
- 1.San Antonio15
- 2.Dallas12
- 3.Richardson10
- 4.Austin7
- 5.Allen6
Mega projects in Texas
12 tracked projects · 36.0 GW planned capacity · $217.9B announced
Advanced Energy Campus (Fermi America) (Carson County, TX)
Fermi America
Project Matador, the Texas panhandle campus now marketed at 17 GW with roughly 6 GW permitted. TensorWave signed a 15-year, $6.5B lease for the first 222 MW building in August 2026, with deliveries staged for the second half of 2027. Satellite imagery through spring 2026 showed land clearing, not vertical construction.
Target: 2027Source: Bisnow (Aug 2026)Basis: developer disclosed MW, press reportedDetails & sources
Data City Texas (Laredo, TX)
Energy Abundance Development
Proposed 5 GW behind-the-meter data center hub near Laredo, billed as the world's largest. Commercial operations targeted for 2029; no permits, tenants, or construction reported.
Target: 2029Source: RGV Business Journal (Feb 2026)Basis: developer disclosed MW, press reportedDetails & sources
Matrix Data Center Campus (Sulphur Springs, TX)
MSB Global Services
3 GW campus in Hopkins County that broke ground in February 2025; Phase I is 800 MW with the first building targeted for late 2026 and full build by 2029.
Target: 2029Source: Gilmer Mirror (Feb 2026)Basis: developer disclosed MW, developer-stated campus costDetails & sources
Google Texas Expansion (Haskell County, TX)
Google's $40B Texas expansion. Two Haskell County campuses are under construction, and a third Google-linked campus in Ranger received a county tax abatement in April 2026. No megawatt figure has been published.
Target: 2027Source: KTXS (May 2026)Basis: malachi.energy estimate MW, multi-site or statewide commitmentDetails & sources
Microsoft Pecos (Project Kilby) (Pecos, TX)
Microsoft / Chevron
2,000-acre behind-the-meter AI campus with a 20-year Chevron gas supply deal (June 2026) and no ERCOT interconnect; final investment decision due by end of 2026. The $8B is the midpoint of Chevron's power plant capex; campus cost is undisclosed.
Target: 2028Source: Chevron (Jun 2026)Basis: press or analyst reported MW, on-site power plant cost onlyDetails & sources
Vantage Frontier (Albany, TX)
Vantage Data Centers
Vantage Data Centers' massive West Texas campus near Abilene, part of the emerging Texas data center corridor.
Target: 2026Source: Epoch AI (Apr 2026)Basis: developer disclosed MW, developer-stated campus costDetails & sources
Stargate (Abilene, TX)
OpenAI / SoftBank / Oracle
OpenAI's flagship Stargate campus. Buildings 1-4 serving about 420 MW of IT load as of September 2026, buildings 5-8 structurally complete, full 1.2 GW projected by late 2026. A 600 MW expansion was scrapped in March 2026. Investment is Epoch AI's projected site cost at full buildout; the $100B figure often quoted is the program-wide Stargate commitment.
Target: 2026Source: Epoch AI (Sep 2026)Basis: developer disclosed MW, third-party analyst estimateDetails & sources
Stargate Milam County (Milam County, TX)
SB Energy / OpenAI
SB Energy-operated Stargate campus in central Texas. Building 1 framed, first delivery targeted for October 2026, full 1.2 GW by Q4 2028.
Target: 2026Source: Epoch AI (Apr 2026)Basis: developer disclosed MW, third-party analyst estimateDetails & sources
Meta El Paso (El Paso, TX)
Meta / BlackRock
Meta's 1 GW far west Texas campus, raised to a $10B+ commitment from Meta in March 2026, with about $14B in total development costs for the buildings and supporting power, cooling, and connectivity infrastructure. A BlackRock-led venture took an 80% stake in July 2026; more than 2,300 workers on site, with capacity coming online from 2028.
Target: 2028Source: Meta (Jul 2026)Basis: developer disclosed MW, developer-stated campus costDetails & sources
Galaxy Digital Helios (Dickens County, TX)
Galaxy Digital
Galaxy Digital's Helios campus delivered Phase I (133 MW of IT load, a $1.7B build) to CoreWeave in Q2 2026, with Phase II (260 MW) due from the first half of 2027. CoreWeave has committed to the campus's original 800 MW of approved power; ERCOT approved another 830 MW in January 2026 for a total of 1.63 GW, with no tenant yet for the addition.
Target: 2026Source: Galaxy, SEC 8-K (Oct 2025)Basis: developer disclosed MW, developer-stated first-phase costDetails & sources
CyrusOne Freestone County (Freestone County, TX)
CyrusOne / Calpine
CyrusOne's two-phase 760 MW campus co-located with Calpine generation broke ground in June 2026. First building targeted for Q4 2026; $1.5B covers the first three buildings.
Target: 2026Source: Freestone County Times (Jun 2026)Basis: developer disclosed MW, developer-stated first-phase costDetails & sources
Nexus Hubbard (Anthropic) (Hubbard, TX)
Nexus Data Centers / Google
Google-backed campus for Anthropic in Hill County, up to 600 MW in its first phase with a developer target of 7.7 GW. Nexus reached a final investment decision in August 2026 on a roughly $16B project finance package for that phase; the first building has been under construction since January 2026 and is due in October 2027.
Target: 2027Source: W.Media (Aug 2026)Basis: press or analyst reported MW, press reportedDetails & sources
All verified data centers in Texas
215 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.
| Name | Operator | City | Address |
|---|---|---|---|
| Unnamed facility | Unknown | Abilene | 251 Lancium Wy (address point) |
| Unnamed facility | Unknown | Abilene | 351 Lancium Wy (address point) |
| Evoque Allen DA1 | Centersquare | Allen | 900 Guardians Way |
| Unnamed facility | Unknown | Allen | 800 Guardians Way |
| Unnamed facility | TierPoint | Allen | 820 Allen Commerce Parkway |
| Unnamed facility | ScaleMatrix | Allen | 820 Allen Commerce Parkway |
| Unnamed facility | CyrusOne | Allen | 2300 Chelsea Boulevard |
| Unnamed facility | CyrusOne | Allen | 2300 Chelsea Boulevard |
| Alpheus DataCenter | Alpheus | Austin | 1905 East 6th Street |
| Data Foundry - Texas 1 | Unknown | Austin | 4100 Smith School Road |
| Data Foundry - Texas 2 | Unknown | Austin | 4100 Smith School Road |
| Digital Realty Austin AUS11 | Unknown | Austin | 7500 Metro Center Drive |
| LightEdge Austin II | Unknown | Austin | 7000B Burleson Road |
| Unnamed facility | CyrusOne | Austin | 7301 Metropolis Drive |
| Unnamed facility | CyrusOne | Austin | 7100 Metropolis Drive |
| CoreSpace Dallas | CoreSpace | Dallas | 7505 John W Carpenter Freeway |
| DataBank | Unknown | Dallas | 400 South Akard Street |
| DataBank Dallas Empire Central Data Center | DataBank | Dallas | 1100 Empire Central Place |
| Equinix Infomart | Equinix | Dallas | 1950 North Stemmons Freeway |
| Flexential Dallas - Downtown Dallas | Flexential | Dallas | 1950 North Stemmons Freeway |
| Live Oak Data Center | Unknown | Dallas | 2020 Live Oak Street |
| Lumen Dallas - 3180 Irving Blvd. | Lumen Technologies | Dallas | 3180 Irving Boulevard |
| Prime DFW01-01 | Prime | Dallas | 1515 Round Table Drive |
| Prime DFW01-01 | Prime | Dallas | 1515 Round Table Drive |
| Rad Web Hosting | Unknown | Dallas | 400 South Akard Street |
| TierPoint Dallas Data Center | TierPoint | Dallas | 3004 Irving Boulevard |
| VIRTBIZ | Unknown | Dallas | 2805 Canton Street |
| MDC | Unknown | El Paso | 11455 Cedar Oak Drive |
| Amazon Web Services | Amazon Web Services | Euless | 1001 Bear Creek Parkway (address point) |
| Novartis | Unknown | Fort Worth | 6551 South Freeway (address point) |
| QTS Data Center | Quality Technology Services | Fort Worth | 14100 Park Vista Boulevard (address point) |
| Unnamed facility | CyrusOne | Fort Worth | 9501 Ashphalt Road |
| NTT | NTT | Garland | 2080 Lookout Drive (address point) |
| Stream Data Centers DFWA | Stream Data Centers | Garland | 1813 Lookout Drive |
| MARA Data Center | Marathon Digital Holdings | Granbury | 2001 Mitchell Bend Highway |
| Data Foundry | Unknown | Houston | 660 Greens Parkway (address point) |
| Rice Data Center | Unknown | Houston | 1160 Main Street |
| Unnamed facility | DXC Technology | Houston | 15555 Cutten Road (address point) |
| QTS Irving - Dallas Data Center Campus | Quality Technology Services | Irving | 6431 Longhorn Drive |
| Skybox Houston One | Skybox | Katy | 22000 Franz Road (address point) |
| Precision Prints Lufkin Datacenter | Unknown | Lufkin | 1602 Brentwood Drive (address point) |
| Alinged Data Center DFW-03 | Aligned Data Centers, LLC | Mansfield | 3801 Britton Road |
| Midlothian | 3441 Railport Parkway (address point) | ||
| Thin-nology | Unknown | Pflugerville | 3804 Helios Way |
| Aligned DFW-01 | Aligned | Plano | 2800 Summit Avenue |
| Aligned DFW-02 | Aligned | Plano | 2800 Summit Avenue |
| Aligned Data Centers DFW-04 | Aligned Data Centers | Plano | 401 North Star Road |
| DataBank Plano Data Center | DataBank | Plano | 8375 Dominion Parkway |
| Flexential Dallas - Plano | Flexential | Plano | 3500 East Plano Parkway |
| Compass Data Center | Unknown | Red Oak | 300 Houston School Road |
| Compass Data Center | Unknown | Red Oak | 581 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 541 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 501 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 481 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 441 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 500 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 540 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 580 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 550 North Austin Boulevard (address point) |
| Compass Data Center | Unknown | Red Oak | 590 North Austin Boulevard (address point) |
| Red Oak | 330 North Austin Boulevard (address point) | ||
| Digital Realty Dallas DFW16 | Digital Realty | Richardson | 1232 Alma Road |
| Digital Realty Dallas DFW17 | Digital Realty | Richardson | 900 Quality Way |
| Digital Realty Dallas DFW18 | Digital Realty | Richardson | 1210 Integrity Drive |
| Digital Realty Dallas DFW28 | Digital Realty | Richardson | 850 East Collins Boulevard |
| Digital Realty Dallas DFW29 | Digital Realty | Richardson | 950 East Collins Boulevard |
| Digital Realty Dallas DFW35 | Digital Realty | Richardson | 907 Security Row |
| Flexential Dallas - Richardson | Flexential | Richardson | 3010 Waterview Parkway |
| Rackspace Richardson DFW3 | Rackspace | Richardson | 1215 Integrity Drive |
| Stream DFW IV | Stream | Richardson | 3300 Essex Drive |
| Unnamed facility | Unknown | Richardson | 904 Quality Way |
| CITIGROUP TECHNOLOGY INC | Unknown | Roanoke | 931 Litsey Road (address point) |
| Switch: The Rock | Switch | Round Rock | 150 Dell Way (address point) |
| Amazon AWS SAT - 12807 Donop | Amazon Web Services | San Antonio | 12807 Donop Road (address point) |
| CyrusOne San Antonio I | CyrusOne | San Antonio | 9999 Westover Hills Boulevard |
| GVTC | GVTC | San Antonio | 25854 Overlook Parkway (address point) |
| H5 Data Centers San Antonio | H5 Data Centers | San Antonio | 100 Taylor Street |
| Lowe's Data Center | Lowe's | San Antonio | 10045 Rogers Run (address point) |
| Lumen San Antonio 2 | Lumen Technologies | San Antonio | 1203 North Frio Street (address point) |
| Microsoft | Microsoft | San Antonio | 3823 Wiseman Boulevard |
| Microsoft | Microsoft | San Antonio | 5200 Rogers Road |
| Microsoft | Microsoft | San Antonio | 15452 Omicron Drive (address point) |
| Microsoft San Antonio | Microsoft | San Antonio | 5150 Rogers Road |
| Microsoft SAT 80 | Microsoft | San Antonio | 18844 FM1957 |
| Microsoft SAT 81 | Microsoft | San Antonio | 18844 FM1957 |
| Microsoft SAT 82 | Microsoft | San Antonio | 18844 FM1957 |
| QTS San Antonio II | Quality Technology Services | San Antonio | 8635 Potranco Road |
| Stream San Antonio II | Unknown | San Antonio | 9550 Westover Hills Boulevard (address point) |
| Texas Cryptologic Center | National Security Agency | San Antonio | 7700 Potranco Road (address point) |
| Valero Wiserman | Valero | San Antonio | 3535 Wiseman Boulevard (address point) |
| Vantage Data Centers TX21 | Vantage Data Centers | San Antonio | 5207 Rogers Road |
| Vantage Data Centers TX22 | Vantage Data Centers | San Antonio | 5207 Rogers Road |
| Vantage TX11 | Vantage Data Centers | San Antonio | 14720 Omicron Drive |
| Vantage TX12 | Vantage Data Centers | San Antonio | 14720 Omicron Drive |
| Vantage TX12 | Vantage Data Centers | San Antonio | 14720 Omicron Drive |
| Unnamed facility | CHRISTUS Health | San Antonio | 10002 Rogers Run (address point) |
| Unnamed facility | Frost Bank | San Antonio | 10010 Rogers Run (address point) |
| Unnamed facility | HEB | San Antonio | 15103 Huebner Road |
| Unnamed facility | Unknown | San Antonio | 11203 Military Drive West (address point) |
| Unnamed facility | Unknown | San Antonio | 1707 West Loop 1604 North (address point) |
| Unnamed facility | Unknown | San Antonio | 14677 Omicron Drive (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Unnamed facility | Unknown | San Antonio | 1050 Democracy (address point) |
| Verizon Wireless Mew Building | Unknown | Southlake | 500 West Dove Road (address point) |
| Unnamed facility | Unknown | Temple | 3101 BLD A Industrial Boulevard (address point) |
| Unnamed facility | Unknown | Temple | 3101 BLD B Industrial Boulevard (address point) |
| Stream Data Centers Houston | Unknown | The Woodlands | 4001 Technology Forest Boulevard |
| Unnamed facility | Unknown | Wichita Falls | 2236 Airport Drive |
| Amazon | Unknown | Unknown | Not listed |
| Argo Data Center | Unknown | Unknown | Not listed |
| Charles Schwab Data Center | Unknown | Unknown | Not listed |
| Cisco Allen | Unknown | Unknown | 2260 Chelsea Boulevard |
| Cortex supercomputer | Unknown | Unknown | Not listed |
| CyrusOne San Antonio II | CyrusOne | Unknown | Not listed |
| CyrusOne San Antonio III | CyrusOne | Unknown | Not listed |
| CyrusOne San Antonio IV | Unknown | Unknown | Not listed |
| CyrusOne SAT10 & SAT11 | CyrusOne | Unknown | Not listed |
| Cyxtera Dallas-Fort Worth Data Center | Cyxtera | Unknown | 14950 Kingsport Road |
| Data Foundry Austin 1 Data Center | Unknown | Unknown | 7401 East Ben White Boulevard |
| Digital Realty | Digital Realty | Unknown | 1505 Ferris Road |
| Digital Realty | Digital Realty | Unknown | Not listed |
| Element Critical | Unknown | Unknown | 8025 North Interstate Highway 35 Service Road |
| Experian McKinney Data Center | Unknown | Unknown | 3400 South Stonebridge Drive |
| Facebook Fort Worth Datacenter | Meta | Unknown | 4500 Like Way |
| Facebook Fort Worth Datacenter | Meta | Unknown | Not listed |
| Facebook Fort Worth Datacenter | Meta | Unknown | Not listed |
| Unknown | Not listed | ||
| Unknown | Not listed | ||
| IONIC Digital Cedarvale | IONIC Digital | Unknown | Not listed |
| LightEdge Austin I | Unknown | Unknown | 2916 Montopolis Drive |
| Lumen Austin 1 | Unknown | Unknown | 4209 Smith School Road |
| Lumen Austin 3 | Lumen Technologies | Unknown | Not listed |
| Lumen Dallas 6 | Lumen Technologies | Unknown | 1150 Regal Row |
| Microsoft | Microsoft | Unknown | Not listed |
| Microsoft | Microsoft | Unknown | Not listed |
| Microsoft | Microsoft | Unknown | Not listed |
| Microsoft Texas Research Park Campus | Microsoft | Unknown | Not listed |
| Microsoft TRP1 | Microsoft | Unknown | Not listed |
| Microsoft TRP2 | Microsoft | Unknown | Not listed |
| Microsoft TRP3 (SAT46) | Microsoft | Unknown | Not listed |
| NTT | NTT | Unknown | Not listed |
| NTT | NTT | Unknown | Not listed |
| NTT | NTT | Unknown | Not listed |
| Vantage San Antonio I | Vantage Data Centers | Unknown | Not listed |
| Unnamed facility | DXC Technology | Unknown | Not listed |
| Unnamed facility | DXC Technology | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
Frequently asked questions
How many data centers are in Texas?
Texas has 215 data centers verified in OpenStreetMap as of October 2026, and an estimated 779 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 2nd of 48 states and territories by verified count.
Where are the data centers in Texas?
The largest concentrations in Texas are San Antonio with 15 verified facilities, Dallas with 12 verified facilities, Richardson with 10 verified facilities, Austin with 7 verified facilities, and Allen with 6 verified facilities. The full table below lists every verified facility in the state with its operator and address.
Who operates the most data centers in Texas?
By number of OSM-verified facilities, the largest data center operators in Texas are Microsoft (14), CyrusOne (9), Digital Realty (8), Vantage Data Centers (6), and Google (4). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.
What large data centers are being built in Texas?
Malachi.Energy tracks 12 mega projects in Texas as of October 2026: Advanced Energy Campus (Fermi America) in Carson County, TX, 17.0 GW and about $50 billion, announced, targeted for 2027; Data City Texas (Energy Abundance Development) in Laredo, TX, 5.0 GW and about $10 billion, proposed, targeted for 2029; Matrix Data Center Campus (MSB Global Services) in Sulphur Springs, TX, 3.0 GW and about $19 billion, under construction, targeted for 2029; Google Texas Expansion in Haskell County, TX, 2.0 GW and about $40 billion, under construction, targeted for 2027; Microsoft Pecos (Project Kilby) (Microsoft / Chevron) in Pecos, TX, 2.0 GW and about $8 billion, announced, targeted for 2028; Vantage Frontier (Vantage Data Centers) in Albany, TX, 1.4 GW and about $25 billion, under construction, targeted for 2026; Stargate (OpenAI / SoftBank / Oracle) in Abilene, TX, 1.2 GW and about $32 billion, operational, targeted for 2026; Stargate Milam County (SB Energy / OpenAI) in Milam County, TX, 1.2 GW and about $1 billion, under construction, targeted for 2026; Meta El Paso (Meta / BlackRock) in El Paso, TX, 1.0 GW and about $14 billion, under construction, targeted for 2028; Galaxy Digital Helios in Dickens County, TX, 800 MW and about $2 billion, operational, targeted for 2026; CyrusOne Freestone County (CyrusOne / Calpine) in Freestone County, TX, 760 MW and about $2 billion, under construction, targeted for 2026; and Nexus Hubbard (Anthropic) (Nexus Data Centers / Google) in Hubbard, TX, 600 MW and about $16 billion, under construction, targeted for 2027. Together they total 36.0 GW of planned capacity and about $218 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.
Data centers in other states
Bordering Texas
Most verified facilities
Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.