Matrix Data Center Campus
Under ConstructionMSB Global Services · Sulphur Springs, TX
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Matrix Data Center Campus by MSB Global Services in Sulphur Springs, TX is planned at 3.0 GW and about $18.7 billion, and is under construction, with a 2029 target as of September 2026. It ranks 8th of 54 tracked US mega projects by planned capacity, 2.7% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
3.0 GW
Developer disclosed
$18.7 billion
Developer-stated campus cost
Under construction
As of September 2026
2029
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Gilmer Mirror, February 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
3 GW campus in Hopkins County that broke ground in February 2025; Phase I is 800 MW with the first building targeted for late 2026 and full build by 2029.
Location
- Site
- Sulphur Springs, TX
- Coordinates
- 33.14, -95.60
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Galaxy Digital HeliosDickens County, TX, 1.6 GW, operational
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, announced
Cite this record
Rein, Malachi (2026). Matrix Data Center Campus (Sulphur Springs, TX). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/msb-matrix-sulphur-springs-tx
@misc{malachienergy_msb_matrix_sulphur_springs_tx_2026,
author = {Rein, Malachi},
title = {Matrix Data Center Campus (Sulphur Springs, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/msb-matrix-sulphur-springs-tx}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.