Data City Texas
ProposedEnergy Abundance Development · Laredo, TX
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Data City Texas by Energy Abundance Development in Laredo, TX is planned at 5.0 GW and about $10 billion, and is proposed, with a 2029 target as of September 2026. It ranks 6th of 54 tracked US mega projects by planned capacity, 4.6% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is press reported. Confidence is low: the project is proposed without permits, or the capacity is an estimate. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
5.0 GW
Developer disclosed
$10 billion
Press reported
Proposed
As of September 2026
2029
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Press reported
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- RGV Business Journal, February 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Proposed 5 GW behind-the-meter data center hub near Laredo, billed as the world's largest. Commercial operations targeted for 2029; no permits, tenants, or construction reported.
Location
- Site
- Laredo, TX
- Coordinates
- 27.51, -99.51
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Galaxy Digital HeliosDickens County, TX, 1.6 GW, operational
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, announced
Cite this record
Rein, Malachi (2026). Data City Texas (Laredo, TX). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/data-city-laredo
@misc{malachienergy_data_city_laredo_2026,
author = {Rein, Malachi},
title = {Data City Texas (Laredo, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Press reported.},
url = {https://malachi.energy/data-centers/projects/data-city-laredo}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.