Galaxy Digital Helios
OperationalGalaxy Digital · Dickens County, TX
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Galaxy Digital Helios in Dickens County, TX is planned at 1.6 GW and about $1.4 billion, and is operational, with a 2026 target as of September 2026. It ranks 21st of 54 tracked US mega projects by planned capacity, 1.5% of the 109.2 GW national total. The capacity figure is utility, iso, or government filing; the investment figure is developer-stated first-phase cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
1.6 GW
Utility, ISO, or government filing
$1.4 billion
Developer-stated first-phase cost
Operational
As of September 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Utility, ISO, or government filing
- Investment basis
- Developer-stated first-phase cost
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- PR Newswire, July 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Galaxy Digital's Helios campus delivered Phase I (133 MW of IT load) to CoreWeave in Q2 2026, with Phase II (260 MW) due in the first half of 2027. ERCOT-approved capacity is 1.63 GW, potentially scaling to 3.6 GW.
Location
- Site
- Dickens County, TX
- Coordinates
- 33.62, -100.78
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, announced
Cite this record
Rein, Malachi (2026). Galaxy Digital Helios (Dickens County, TX). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/galaxy-helios-tx
@misc{malachienergy_galaxy_helios_tx_2026,
author = {Rein, Malachi},
title = {Galaxy Digital Helios (Dickens County, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Utility, ISO, or government filing. Investment basis: Developer-stated first-phase cost.},
url = {https://malachi.energy/data-centers/projects/galaxy-helios-tx}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: utility, iso, or government filing. Investment basis: developer-stated first-phase cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.