Galaxy Digital Helios in Dickens County, TX is planned at 800 MW and about $1.7 billion, and is operational, with a 2026 target as of October 2026. It ranks 40th of 56 tracked US mega projects by planned capacity, 0.8% of the 106.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated first-phase cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 12 mega projects in Texas in total.

Key figures

Planned capacity

800 MW

Developer disclosed

Announced investment

$1.7 billion

Developer-stated first-phase cost

Status

Operational

As of October 2026

Target year

2026

First load or full build per source

Where the figures come from

Capacity basis
Developer disclosed
Investment basis
Developer-stated first-phase cost
Nearest high-voltage transmission
The campus sits 0.2 miles from the nearest 345 kV transmission line, per HIFLD transmission data current to September 2023, computed 2026-10-02. 7 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 345 kV. Source: HIFLD
Location basis
Campus footprint identified. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: OpenStreetMap way 1490401523 'Argo Data Center'.
Confidence
Medium: one figure is reported, estimated, or scoped differently than the campus.
Counted in headline totals
Yes. The investment figure is developer-stated campus cost and is comparable across projects.
Primary source
Galaxy, SEC 8-K, October 2025
Last verified
, dataset version 2026-10-03. Re-checked whenever the project list is refreshed.

Basis and confidence definitions are in the directory methodology.

What is known

Galaxy Digital's Helios campus delivered Phase I (133 MW of IT load, a $1.7B build) to CoreWeave in Q2 2026, with Phase II (260 MW) due from the first half of 2027. CoreWeave has committed to the campus's original 800 MW of approved power; ERCOT approved another 830 MW in January 2026 for a total of 1.63 GW, with no tenant yet for the addition.

Location

Site
Dickens County, TX
Coordinates
33.78, -100.87
State directory
Data centers in Texas (215 verified facilities)

Other tracked projects in Texas

Cite this record

Rein, Malachi (2026). Galaxy Digital Helios (Dickens County, TX). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/galaxy-helios-tx

@misc{malachienergy_galaxy_helios_tx_2026,
  author = {Rein, Malachi},
  title = {Galaxy Digital Helios (Dickens County, TX)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-10-03. Capacity basis: Developer disclosed. Investment basis: Developer-stated first-phase cost.},
  url = {https://malachi.energy/data-centers/projects/galaxy-helios-tx}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated first-phase cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.