Galaxy Digital Helios
OperationalGalaxy Digital · Dickens County, TX
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Galaxy Digital Helios in Dickens County, TX is planned at 800 MW and about $1.7 billion, and is operational, with a 2026 target as of October 2026. It ranks 40th of 56 tracked US mega projects by planned capacity, 0.8% of the 106.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated first-phase cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
800 MW
Developer disclosed
$1.7 billion
Developer-stated first-phase cost
Operational
As of October 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated first-phase cost
- Nearest high-voltage transmission
- The campus sits 0.2 miles from the nearest 345 kV transmission line, per HIFLD transmission data current to September 2023, computed 2026-10-02. 7 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 345 kV. Source: HIFLD
- Location basis
- Campus footprint identified. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: OpenStreetMap way 1490401523 'Argo Data Center'.
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Galaxy, SEC 8-K, October 2025
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
Galaxy Digital's Helios campus delivered Phase I (133 MW of IT load, a $1.7B build) to CoreWeave in Q2 2026, with Phase II (260 MW) due from the first half of 2027. CoreWeave has committed to the campus's original 800 MW of approved power; ERCOT approved another 830 MW in January 2026 for a total of 1.63 GW, with no tenant yet for the addition.
Location
- Site
- Dickens County, TX
- Coordinates
- 33.78, -100.87
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, under construction
Cite this record
Rein, Malachi (2026). Galaxy Digital Helios (Dickens County, TX). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/galaxy-helios-tx
@misc{malachienergy_galaxy_helios_tx_2026,
author = {Rein, Malachi},
title = {Galaxy Digital Helios (Dickens County, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Developer disclosed. Investment basis: Developer-stated first-phase cost.},
url = {https://malachi.energy/data-centers/projects/galaxy-helios-tx}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated first-phase cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.