Stargate by OpenAI / SoftBank / Oracle in Abilene, TX is planned at 1.2 GW and about $32 billion, and is operational, with a 2026 target as of October 2026. It ranks 24th of 56 tracked US mega projects by planned capacity, 1.1% of the 106.2 GW national total. The capacity figure is developer disclosed; the investment figure is third-party analyst estimate. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
1.2 GW
Developer disclosed
$32 billion
Third-party analyst estimate
Operational
As of October 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Third-party analyst estimate
- Nearest high-voltage transmission
- The campus sits 1.6 miles from the nearest 345 kV transmission line, owned by Big Country Electric Coop, Inc, per HIFLD transmission data current to September 2023, computed 2026-10-02. 6 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 345 kV. Source: HIFLD
- Location basis
- Campus footprint identified. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: OpenStreetMap way 1432100334 'Lancium Clean Campus' (landuse=construction).
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Epoch AI, September 2026
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
OpenAI's flagship Stargate campus. Buildings 1-4 serving about 420 MW of IT load as of September 2026, buildings 5-8 structurally complete, full 1.2 GW projected by late 2026. A 600 MW expansion was scrapped in March 2026. Investment is Epoch AI's projected site cost at full buildout; the $100B figure often quoted is the program-wide Stargate commitment.
Location
- Site
- Abilene, TX
- Coordinates
- 32.50, -99.79
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- Galaxy Digital HeliosDickens County, TX, 800 MW, operational
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, under construction
Cite this record
Rein, Malachi (2026). Stargate (Abilene, TX). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/stargate-abilene
@misc{malachienergy_stargate_abilene_2026,
author = {Rein, Malachi},
title = {Stargate (Abilene, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Developer disclosed. Investment basis: Third-party analyst estimate.},
url = {https://malachi.energy/data-centers/projects/stargate-abilene}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: third-party analyst estimate. Dataset version . Maintained by Malachi Rein for Malachi.Energy.