Meta El Paso
Under ConstructionMeta / BlackRock · El Paso, TX
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Meta El Paso by Meta / BlackRock in El Paso, TX is planned at 1.0 GW and about $10 billion, and is under construction, with a 2028 target as of September 2026. It ranks 34th of 54 tracked US mega projects by planned capacity, 0.9% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is high: both figures come from the developer or a filing and the site has physical progress or firm contracts. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
1.0 GW
Developer disclosed
$10 billion
Developer-stated campus cost
Under construction
As of September 2026
2028
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Confidence
- High: both figures come from the developer or a filing and the site has physical progress or firm contracts.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Meta, July 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Meta's 1 GW far west Texas campus, raised to a $10B+ commitment in March 2026. A BlackRock-led venture took an 80% stake in July 2026; more than 2,300 workers on site, with capacity coming online from 2028.
Location
- Site
- El Paso, TX
- Coordinates
- 31.76, -106.45
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Galaxy Digital HeliosDickens County, TX, 1.6 GW, operational
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, announced
Cite this record
Rein, Malachi (2026). Meta El Paso (El Paso, TX). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/meta-el-paso-tx
@misc{malachienergy_meta_el_paso_tx_2026,
author = {Rein, Malachi},
title = {Meta El Paso (El Paso, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/meta-el-paso-tx}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.