Nexus Hubbard (Anthropic)
Under ConstructionNexus Data Centers / Google · Hubbard, TX
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Nexus Hubbard (Anthropic) by Nexus Data Centers / Google in Hubbard, TX is planned at 600 MW and about $16 billion, and is under construction, with a 2027 target as of October 2026. It ranks 44th of 56 tracked US mega projects by planned capacity, 0.6% of the 106.2 GW national total. The capacity figure is press or analyst reported; the investment figure is press reported. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
600 MW
Press or analyst reported
$16 billion
Press reported
Under construction
As of October 2026
2027
First load or full build per source
Where the figures come from
- Capacity basis
- Press or analyst reported
- Investment basis
- Press reported
- Nearest high-voltage transmission
- The campus sits 14 miles from the nearest 345 kV transmission line, owned by Oncor Electric Delivery Co., per HIFLD transmission data current to September 2023, computed 2026-10-02. No line rated 230 kV or higher passes within 5 miles of the campus. Source: HIFLD
- Location basis
- Public address, geocoded. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: Hillsboro Reporter, 'Nexus lays out Hubbard data center plan'.
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- W.Media, August 2026
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
Google-backed campus for Anthropic in Hill County, up to 600 MW in its first phase with a developer target of 7.7 GW. Nexus reached a final investment decision in August 2026 on a roughly $16B project finance package for that phase; the first building has been under construction since January 2026 and is due in October 2027.
Location
- Site
- Hubbard, TX
- Coordinates
- 31.82, -96.78
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- Galaxy Digital HeliosDickens County, TX, 800 MW, operational
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
Cite this record
Rein, Malachi (2026). Nexus Hubbard (Anthropic) (Hubbard, TX). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/nexus-hubbard-tx
@misc{malachienergy_nexus_hubbard_tx_2026,
author = {Rein, Malachi},
title = {Nexus Hubbard (Anthropic) (Hubbard, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Press or analyst reported. Investment basis: Press reported.},
url = {https://malachi.energy/data-centers/projects/nexus-hubbard-tx}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.