Summary
Google Texas Expansion in Haskell County, TX is planned at 2.0 GW and about $40 billion, and is under construction, with a 2027 target as of October 2026. It ranks 12th of 56 tracked US mega projects by planned capacity, 1.9% of the 106.2 GW national total. The capacity figure is malachi.energy estimate; the investment figure is multi-site or statewide commitment. Confidence is low: the project is proposed without permits, or the capacity is an estimate. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
2.0 GW
Malachi.Energy estimate
$40 billion
Multi-site or statewide commitment
Under construction
As of October 2026
2027
First load or full build per source
Where the figures come from
- Capacity basis
- Malachi.Energy estimate
- Investment basis
- Multi-site or statewide commitment
- Nearest high-voltage transmission
- The campus sits 0.7 miles from the nearest 345 kV transmission line, owned by Tri-County Electric Coop, Inc, per HIFLD transmission data current to September 2023, computed 2026-10-02. 5 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 345 kV. Source: HIFLD
- Location basis
- Public address, geocoded. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: DCD, 'Google-linked Housebound Group files for two data center projects in Haskell, Texas'.
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- KTXS, May 2026
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
Google's $40B Texas expansion. Two Haskell County campuses are under construction, and a third Google-linked campus in Ranger received a county tax abatement in April 2026. No megawatt figure has been published.
Location
- Site
- Haskell County, TX
- Coordinates
- 33.16, -99.57
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Microsoft Pecos (Project Kilby)Pecos, TX, 2.0 GW, announced
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- Galaxy Digital HeliosDickens County, TX, 800 MW, operational
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, under construction
Cite this record
Rein, Malachi (2026). Google Texas Expansion (Haskell County, TX). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/google-texas-expansion
@misc{malachienergy_google_texas_expansion_2026,
author = {Rein, Malachi},
title = {Google Texas Expansion (Haskell County, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Malachi.Energy estimate. Investment basis: Multi-site or statewide commitment.},
url = {https://malachi.energy/data-centers/projects/google-texas-expansion}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: malachi.energy estimate. Investment basis: multi-site or statewide commitment. Dataset version . Maintained by Malachi Rein for Malachi.Energy.