Microsoft Pecos (Project Kilby)
AnnouncedMicrosoft / Chevron · Pecos, TX
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Microsoft Pecos (Project Kilby) by Microsoft / Chevron in Pecos, TX is planned at 2.0 GW and about $8 billion, and is announced, with a 2028 target as of September 2026. It ranks 16th of 54 tracked US mega projects by planned capacity, 1.8% of the 109.2 GW national total. The capacity figure is press or analyst reported; the investment figure is on-site power plant cost only. Confidence is low: the project is proposed without permits, or the capacity is an estimate. Malachi.Energy tracks 12 mega projects in Texas in total.
Key figures
2.0 GW
Press or analyst reported
$8 billion
On-site power plant cost only
Announced
As of September 2026
2028
First load or full build per source
Where the figures come from
- Capacity basis
- Press or analyst reported
- Investment basis
- On-site power plant cost only
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Chevron, June 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
2,000-acre behind-the-meter AI campus with a 20-year Chevron gas supply deal (June 2026) and no ERCOT interconnect; final investment decision due by end of 2026. The $8B is the midpoint of Chevron's power plant capex; campus cost is undisclosed.
Location
- Site
- Pecos, TX
- Coordinates
- 31.42, -103.49
- State directory
- Data centers in Texas (215 verified facilities)
Other tracked projects in Texas
- Advanced Energy Campus (Fermi America)Carson County, TX, 17.0 GW, announced
- Data City TexasLaredo, TX, 5.0 GW, proposed
- Matrix Data Center CampusSulphur Springs, TX, 3.0 GW, under construction
- Google Texas ExpansionHaskell County, TX, 2.0 GW, under construction
- Galaxy Digital HeliosDickens County, TX, 1.6 GW, operational
- Vantage FrontierAlbany, TX, 1.4 GW, under construction
- StargateAbilene, TX, 1.2 GW, operational
- Stargate Milam CountyMilam County, TX, 1.2 GW, under construction
- Meta El PasoEl Paso, TX, 1.0 GW, under construction
- CyrusOne Freestone CountyFreestone County, TX, 760 MW, under construction
- Nexus Hubbard (Anthropic)Hubbard, TX, 600 MW, announced
Cite this record
Rein, Malachi (2026). Microsoft Pecos (Project Kilby) (Pecos, TX). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/microsoft-pecos-kilby-tx
@misc{malachienergy_microsoft_pecos_kilby_tx_2026,
author = {Rein, Malachi},
title = {Microsoft Pecos (Project Kilby) (Pecos, TX)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Press or analyst reported. Investment basis: On-site power plant cost only.},
url = {https://malachi.energy/data-centers/projects/microsoft-pecos-kilby-tx}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: on-site power plant cost only. Dataset version . Maintained by Malachi Rein for Malachi.Energy.