CoreWeave Kenilworth

Under Construction

CoreWeave · Kenilworth, NJ

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Summary

CoreWeave Kenilworth in Kenilworth, NJ is planned at 250 MW and about $1.8 billion, and is under construction, with a 2027 target as of September 2026. It ranks 51st of 54 tracked US mega projects by planned capacity, 0.2% of the 109.2 GW national total. The capacity figure is press or analyst reported; the investment figure is press reported. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. It is the only mega project Malachi.Energy tracks in New Jersey.

Key figures

Planned capacity

250 MW

Press or analyst reported

Announced investment

$1.8 billion

Press reported

Status

Under construction

As of September 2026

Target year

2027

First load or full build per source

Where the figures come from

Capacity basis
Press or analyst reported
Investment basis
Press reported
Confidence
Medium: one figure is reported, estimated, or scoped differently than the campus.
Counted in headline totals
Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
Primary source
News 12, April 2026
Last verified
, dataset version 2026-09-14. Re-checked at every data refresh.

Basis and confidence definitions are in the directory methodology.

What is known

CoreWeave's GPU cloud data center in New Jersey, the first project under the state's new EDA tax credit program.

Location

Site
Kenilworth, NJ
Coordinates
40.68, -74.29
State directory
Data centers in New Jersey (58 verified facilities)

Other tracked projects in New Jersey

This is the only mega project Malachi.Energy tracks in New Jersey.

Cite this record

Rein, Malachi (2026). CoreWeave Kenilworth (Kenilworth, NJ). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/coreweave-kenilworth-nj

@misc{malachienergy_coreweave_kenilworth_nj_2026,
  author = {Rein, Malachi},
  title = {CoreWeave Kenilworth (Kenilworth, NJ)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-09-14. Capacity basis: Press or analyst reported. Investment basis: Press reported.},
  url = {https://malachi.energy/data-centers/projects/coreweave-kenilworth-nj}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.