Project Tembo (formerly Project Jade)

Announced

Google / Tallgrass Energy · Laramie County, WY

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Summary

Project Tembo (formerly Project Jade) by Google / Tallgrass Energy in Laramie County, WY is planned at 1.8 GW and about $17 billion, and is announced, with a 2028 target as of October 2026. It ranks 16th of 56 tracked US mega projects by planned capacity, 1.7% of the 106.2 GW national total. The capacity figure is malachi.energy estimate; the investment figure is press reported. Confidence is low: the project is proposed without permits, or the capacity is an estimate. It is the only mega project Malachi.Energy tracks in Wyoming.

Key figures

Planned capacity

1.8 GW

Malachi.Energy estimate

Announced investment

$17 billion

Press reported

Status

Announced

As of October 2026

Target year

2028

First load or full build per source

Where the figures come from

Capacity basis
Malachi.Energy estimate
Investment basis
Press reported
Nearest high-voltage transmission
The campus sits 0.3 miles from the nearest 230 kV transmission line, owned by Wapa-- Western Area Power Administration, per HIFLD transmission data current to September 2023, computed 2026-10-02. 6 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 230 kV. Source: HIFLD
Location basis
Public address, geocoded. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: New Project Media.
Confidence
Low: the project is proposed without permits, or the capacity is an estimate.
Counted in headline totals
Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
Primary source
Wyoming Tribune Eagle, September 2026
Last verified
, dataset version 2026-10-03. Re-checked whenever the project list is refreshed.

Basis and confidence definitions are in the directory methodology.

What is known

Wyoming's largest data center, near Cheyenne. Google took over after Crusoe left the project in April 2026 and presented a $17B campus to Laramie County in September 2026: four data center buildings instead of five, mass grading late in 2026, vertical construction in 2027, and full buildout in the first half of 2031. Tallgrass builds the on-site power plant. Google has not restated the 1.8 GW announced in the Crusoe era.

Location

Site
Laramie County, WY
Coordinates
41.04, -104.80
State directory
Data centers in Wyoming (23 verified facilities)

Other tracked projects in Wyoming

This is the only mega project Malachi.Energy tracks in Wyoming.

Cite this record

Rein, Malachi (2026). Project Tembo (formerly Project Jade) (Laramie County, WY). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/crusoe-project-jade

@misc{malachienergy_crusoe_project_jade_2026,
  author = {Rein, Malachi},
  title = {Project Tembo (formerly Project Jade) (Laramie County, WY)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-10-03. Capacity basis: Malachi.Energy estimate. Investment basis: Press reported.},
  url = {https://malachi.energy/data-centers/projects/crusoe-project-jade}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: malachi.energy estimate. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.