Project Tembo (formerly Project Jade)
AnnouncedGoogle / Tallgrass Energy · Laramie County, WY
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Project Tembo (formerly Project Jade) by Google / Tallgrass Energy in Laramie County, WY is planned at 1.8 GW and about $17 billion, and is announced, with a 2028 target as of October 2026. It ranks 16th of 56 tracked US mega projects by planned capacity, 1.7% of the 106.2 GW national total. The capacity figure is malachi.energy estimate; the investment figure is press reported. Confidence is low: the project is proposed without permits, or the capacity is an estimate. It is the only mega project Malachi.Energy tracks in Wyoming.
Key figures
1.8 GW
Malachi.Energy estimate
$17 billion
Press reported
Announced
As of October 2026
2028
First load or full build per source
Where the figures come from
- Capacity basis
- Malachi.Energy estimate
- Investment basis
- Press reported
- Nearest high-voltage transmission
- The campus sits 0.3 miles from the nearest 230 kV transmission line, owned by Wapa-- Western Area Power Administration, per HIFLD transmission data current to September 2023, computed 2026-10-02. 6 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 230 kV. Source: HIFLD
- Location basis
- Public address, geocoded. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: New Project Media.
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Wyoming Tribune Eagle, September 2026
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
Wyoming's largest data center, near Cheyenne. Google took over after Crusoe left the project in April 2026 and presented a $17B campus to Laramie County in September 2026: four data center buildings instead of five, mass grading late in 2026, vertical construction in 2027, and full buildout in the first half of 2031. Tallgrass builds the on-site power plant. Google has not restated the 1.8 GW announced in the Crusoe era.
Location
- Site
- Laramie County, WY
- Coordinates
- 41.04, -104.80
- State directory
- Data centers in Wyoming (23 verified facilities)
Other tracked projects in Wyoming
This is the only mega project Malachi.Energy tracks in Wyoming.
Cite this record
Rein, Malachi (2026). Project Tembo (formerly Project Jade) (Laramie County, WY). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/crusoe-project-jade
@misc{malachienergy_crusoe_project_jade_2026,
author = {Rein, Malachi},
title = {Project Tembo (formerly Project Jade) (Laramie County, WY)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Malachi.Energy estimate. Investment basis: Press reported.},
url = {https://malachi.energy/data-centers/projects/crusoe-project-jade}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: malachi.energy estimate. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.