Wyoming data centers at a glance
As of October 2026, Wyoming has 23 data centers verified in OpenStreetMap and an estimated 74 in total. That ranks 18th among the 48 states and territories in the directory and is 1.3% of all verified US facilities. Facilities cluster in Cheyenne (1) and Pine Bluffs (1). The largest operators by mapped sites are Microsoft (2) and University Corporation for Atmospheric Research (1), out of 2 named operators. Malachi.Energy also tracks 1 mega project in Wyoming totaling 1.8 GW of planned capacity and about $17 billion in announced investment, led by Project Tembo (formerly Project Jade) (Google / Tallgrass Energy) in Laramie County, WY, 1.8 GW and about $17 billion, announced, targeted for 2028. Project Tembo (formerly Project Jade), the one tracked project in Wyoming with a site-level location, sits 0.3 miles from the nearest 230 kV transmission line (Wapa-- Western Area Power Administration), per HIFLD transmission data current to September 2023, computed 2026-10-02.
Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Wyoming electricity rates.
Verified
23
OSM-mapped facilities
Estimated
~74
Scaled to industry totals
Top hub
Cheyenne
1 verified facilities
Mega projects
1.8 GW
1 tracked, $17B announced
Map of data centers in Wyoming
County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.
Top operators in Wyoming
By OSM-verified facility count
- 1.Microsoft2
- 2.University Corporation for Atmospheric Research1
Key hubs in Wyoming
Cities with the most verified facilities
- 1.Cheyenne1
- 2.Pine Bluffs1
Mega projects in Wyoming
1 tracked project · 1.8 GW planned capacity · $17B announced
Project Tembo (formerly Project Jade) (Laramie County, WY)
Google / Tallgrass Energy
Wyoming's largest data center, near Cheyenne. Google took over after Crusoe left the project in April 2026 and presented a $17B campus to Laramie County in September 2026: four data center buildings instead of five, mass grading late in 2026, vertical construction in 2027, and full buildout in the first half of 2031. Tallgrass builds the on-site power plant. Google has not restated the 1.8 GW announced in the Crusoe era.
Target: 2028Source: Wyoming Tribune Eagle (Sep 2026)Basis: malachi.energy estimate MW, press reportedDetails & sources
All verified data centers in Wyoming
23 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.
| Name | Operator | City | Address |
|---|---|---|---|
| NCAR-Wyoming Supercomputing Center | University Corporation for Atmospheric Research | Cheyenne | 8120 Veta Drive |
| Unnamed facility | Unknown | Cheyenne | 7700 Commerce Circle (address point) |
| Unnamed facility | Unknown | Cheyenne | 5707 Loving Trail (address point) |
| Unnamed facility | Unknown | Cheyenne | 7710 Commerce Circle (address point) |
| Unnamed facility | Unknown | Gillette | 996 Hwy 50 (address point) |
| Windbreak Cable | Unknown | Pine Bluffs | 210 Main Street |
| CYS41 Datacenter | Microsoft | Unknown | Not listed |
| CYS42 Datacenter | Microsoft | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
Frequently asked questions
How many data centers are in Wyoming?
Wyoming has 23 data centers verified in OpenStreetMap as of October 2026, and an estimated 74 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 18th of 48 states and territories by verified count.
Where are the data centers in Wyoming?
The largest concentrations in Wyoming are Cheyenne with 1 verified facility and Pine Bluffs with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.
Who operates the most data centers in Wyoming?
By number of OSM-verified facilities, the largest data center operators in Wyoming are Microsoft (2) and University Corporation for Atmospheric Research (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.
What large data centers are being built in Wyoming?
Malachi.Energy tracks 1 mega project in Wyoming as of October 2026: Project Tembo (formerly Project Jade) (Google / Tallgrass Energy) in Laramie County, WY, 1.8 GW and about $17 billion, announced, targeted for 2028. Together they total 1.8 GW of planned capacity and about $17 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.