Data Centers in Wyoming
23 verified facilities · about 67 estimated ·
Wyoming data centers at a glance
As of September 2026, Wyoming has 23 data centers verified in OpenStreetMap and an estimated 67 in total. That ranks 18th among the 48 states and territories in the directory and is 1.3% of all verified US facilities. Facilities cluster in Cheyenne (1) and Pine Bluffs (1). The largest operators by mapped sites are Microsoft (2) and University Corporation for Atmospheric Research (1), out of 2 named operators. Malachi.Energy also tracks 1 mega project in Wyoming totaling 1.8 GW of planned capacity and about $50 billion in announced investment, led by Project Tembo (formerly Project Jade) (Google / Tallgrass Energy) in Laramie County, WY, 1.8 GW and about $50 billion, under construction, targeted for 2028.
Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Wyoming electricity rates.
Verified
23
OSM-mapped facilities
Estimated
~67
Scaled to industry totals
Top hub
Cheyenne
1 verified facilities
Mega projects
1.8 GW
1 tracked, $50B announced
Map of data centers in Wyoming
County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.
Top operators in Wyoming
By OSM-verified facility count
- 1.Microsoft2
- 2.University Corporation for Atmospheric Research1
Key hubs in Wyoming
Cities with the most verified facilities
- 1.Cheyenne1
- 2.Pine Bluffs1
Mega projects in Wyoming
1 tracked project · 1.8 GW planned capacity · $50B announced
Project Tembo (formerly Project Jade) (Laramie County, WY)
Google / Tallgrass Energy
Wyoming's largest data center, near Cheyenne. Google was revealed as the owner in July 2026 after Crusoe exited in spring 2026; Tallgrass remains the power partner with about 2.7 GW of on-site generation. Site work began in 2026, first building early 2028, full build by 2031, scalable to 10 GW. The $50B figure predates Crusoe's exit.
Target: 2028Source: Cowboy State Daily (Jul 2026)
All verified data centers in Wyoming
23 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.
| Name | Operator | City | Address |
|---|---|---|---|
| NCAR-Wyoming Supercomputing Center | University Corporation for Atmospheric Research | Cheyenne | 8120 Veta Drive |
| Windbreak Cable | Unknown | Pine Bluffs | 210 Main Street |
| CYS41 Datacenter | Microsoft | Unknown | Not listed |
| CYS42 Datacenter | Microsoft | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
Frequently asked questions
How many data centers are in Wyoming?
Wyoming has 23 data centers verified in OpenStreetMap as of September 2026, and an estimated 67 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 18th of 48 states and territories by verified count.
Where are the data centers in Wyoming?
The largest concentrations in Wyoming are Cheyenne with 1 verified facility and Pine Bluffs with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.
Who operates the most data centers in Wyoming?
By number of OSM-verified facilities, the largest data center operators in Wyoming are Microsoft (2) and University Corporation for Atmospheric Research (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.
What large data centers are being built in Wyoming?
Malachi.Energy tracks 1 mega project in Wyoming as of September 2026: Project Tembo (formerly Project Jade) (Google / Tallgrass Energy) in Laramie County, WY, 1.8 GW and about $50 billion, under construction, targeted for 2028. Together they total 1.8 GW of planned capacity and about $50 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.
Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.