New Era Energy Campus
ProposedNew Era Energy & Digital · Lea County, NM
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
New Era Energy Campus by New Era Energy & Digital in Lea County, NM is planned at 7.0 GW and about $15 billion, and is proposed, with a 2028 target as of September 2026. It ranks 4th of 54 tracked US mega projects by planned capacity, 6.4% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is low: the project is proposed without permits, or the capacity is an estimate. Malachi.Energy tracks 2 mega projects in New Mexico in total.
Key figures
7.0 GW
Developer disclosed
$15 billion
Developer-stated campus cost
Proposed
As of September 2026
2028
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- GlobeNewswire, August 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Proposed 7 GW AI data center campus powered by 2+ GW natural gas and 5+ GW nuclear on 3,500 acres in southeastern New Mexico.
Location
- Site
- Lea County, NM
- Coordinates
- 32.68, -103.33
- State directory
- Data centers in New Mexico (17 verified facilities)
Other tracked projects in New Mexico
- Project Jupiter (Stargate)Santa Teresa, NM, 2.2 GW, under construction
Cite this record
Rein, Malachi (2026). New Era Energy Campus (Lea County, NM). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/new-era-lea-county
@misc{malachienergy_new_era_lea_county_2026,
author = {Rein, Malachi},
title = {New Era Energy Campus (Lea County, NM)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/new-era-lea-county}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.