Project Jupiter (Stargate)
Under ConstructionSTACK Infrastructure / Oracle · Santa Teresa, NM
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Project Jupiter (Stargate) by STACK Infrastructure / Oracle in Santa Teresa, NM is planned at 2.2 GW and about $165 billion, and is under construction, with a 2026 target as of September 2026. It ranks 11th of 54 tracked US mega projects by planned capacity, 2% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is bond authorization cap. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 2 mega projects in New Mexico in total.
Key figures
2.2 GW
Developer disclosed
$165 billion
Bond authorization cap
Under construction
As of September 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Bond authorization cap
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Daily Lobo, August 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Stargate-affiliated mega campus in Dona Ana County, now cited at about $165B (matching the industrial revenue bonds approved over 30 years) and 2.2 to 2.5 GW. Initial operations targeted for Q4 2026 despite a denied gas pipeline, a pending air permit, and a state DOJ inquiry.
Location
- Site
- Santa Teresa, NM
- Coordinates
- 31.78, -106.66
- State directory
- Data centers in New Mexico (17 verified facilities)
Other tracked projects in New Mexico
- New Era Energy CampusLea County, NM, 7.0 GW, proposed
Cite this record
Rein, Malachi (2026). Project Jupiter (Stargate) (Santa Teresa, NM). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/project-jupiter-nm
@misc{malachienergy_project_jupiter_nm_2026,
author = {Rein, Malachi},
title = {Project Jupiter (Stargate) (Santa Teresa, NM)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Bond authorization cap.},
url = {https://malachi.energy/data-centers/projects/project-jupiter-nm}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: bond authorization cap. Dataset version . Maintained by Malachi Rein for Malachi.Energy.