Novva Borealis
Under ConstructionNovva Data Centers · Mesa, AZ
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Novva Borealis by Novva Data Centers in Mesa, AZ is planned at 300 MW and about $3 billion, and is under construction, with a 2026 target as of October 2026. It ranks 49th of 56 tracked US mega projects by planned capacity, 0.3% of the 106.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. It is the only mega project Malachi.Energy tracks in Arizona.
Key figures
300 MW
Developer disclosed
$3 billion
Developer-stated campus cost
Under construction
As of October 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Nearest high-voltage transmission
- The campus sits 1.3 miles from the nearest 500 kV transmission line, owned by Salt River Project, per HIFLD transmission data current to September 2023, computed 2026-10-02. 8 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 500 kV. Source: HIFLD
- Location basis
- Public address, geocoded. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: PR Newswire.
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Novva Data Centers, August 2024
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
Novva Data Centers' 300 MW campus on 160 acres in southeast Mesa, built in two phases over a decade with water-free cooling. The first phase, 96 MW of critical IT load, was slated to launch in late 2026.
Location
- Site
- Mesa, AZ
- Coordinates
- 33.34, -111.64
- State directory
- Data centers in Arizona (64 verified facilities)
Other tracked projects in Arizona
This is the only mega project Malachi.Energy tracks in Arizona.
Cite this record
Rein, Malachi (2026). Novva Borealis (Mesa, AZ). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/novva-borealis
@misc{malachienergy_novva_borealis_2026,
author = {Rein, Malachi},
title = {Novva Borealis (Mesa, AZ)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/novva-borealis}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.