Novva Borealis
Under ConstructionNovva Data Centers · Mesa, AZ
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Novva Borealis by Novva Data Centers in Mesa, AZ is planned at 300 MW and about $3 billion, and is under construction, with a 2026 target as of September 2026. It ranks 49th of 54 tracked US mega projects by planned capacity, 0.3% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. It is the only mega project Malachi.Energy tracks in Arizona.
Key figures
300 MW
Developer disclosed
$3 billion
Developer-stated campus cost
Under construction
As of September 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Baxtel
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Novva Data Centers' Mesa campus featuring innovative cooling designs optimized for the Arizona desert climate.
Location
- Site
- Mesa, AZ
- Coordinates
- 33.34, -111.59
- State directory
- Data centers in Arizona (64 verified facilities)
Other tracked projects in Arizona
This is the only mega project Malachi.Energy tracks in Arizona.
Cite this record
Rein, Malachi (2026). Novva Borealis (Mesa, AZ). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/novva-borealis
@misc{malachienergy_novva_borealis_2026,
author = {Rein, Malachi},
title = {Novva Borealis (Mesa, AZ)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/novva-borealis}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.