Project Camellia (OpenAI)

Announced

OpenAI · Effingham County, GA

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Summary

Project Camellia (OpenAI) in Effingham County, GA is planned at 3.2 GW and about $20 billion, and is announced, with a 2028 target as of September 2026. It ranks 7th of 54 tracked US mega projects by planned capacity, 2.9% of the 109.2 GW national total. The capacity figure is utility, iso, or government filing; the investment figure is press reported. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 4 mega projects in Georgia in total.

Key figures

Planned capacity

3.2 GW

Utility, ISO, or government filing

Announced investment

$20 billion

Press reported

Status

Announced

As of September 2026

Target year

2028

First load or full build per source

Where the figures come from

Capacity basis
Utility, ISO, or government filing
Investment basis
Press reported
Confidence
Medium: one figure is reported, estimated, or scoped differently than the campus.
Counted in headline totals
Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
Primary source
WTOC, July 2026
Last verified
, dataset version 2026-09-14. Re-checked at every data refresh.

Basis and confidence definitions are in the directory methodology.

What is known

Four-building OpenAI campus at the Savannah Gateway Industrial Hub announced July 2026, backed by a 3.2 GW Georgia Power PPA and phased from 2028 through 2032.

Location

Site
Effingham County, GA
Coordinates
32.30, -81.23
State directory
Data centers in Georgia (38 verified facilities)

Other tracked projects in Georgia

Cite this record

Rein, Malachi (2026). Project Camellia (OpenAI) (Effingham County, GA). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/openai-camellia-effingham-ga

@misc{malachienergy_openai_camellia_effingham_ga_2026,
  author = {Rein, Malachi},
  title = {Project Camellia (OpenAI) (Effingham County, GA)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-09-14. Capacity basis: Utility, ISO, or government filing. Investment basis: Press reported.},
  url = {https://malachi.energy/data-centers/projects/openai-camellia-effingham-ga}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: utility, iso, or government filing. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.