Project Camellia (OpenAI)
AnnouncedOpenAI · Effingham County, GA
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Project Camellia (OpenAI) in Effingham County, GA is planned at 3.2 GW and about $20 billion, and is announced, with a 2028 target as of September 2026. It ranks 7th of 54 tracked US mega projects by planned capacity, 2.9% of the 109.2 GW national total. The capacity figure is utility, iso, or government filing; the investment figure is press reported. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 4 mega projects in Georgia in total.
Key figures
3.2 GW
Utility, ISO, or government filing
$20 billion
Press reported
Announced
As of September 2026
2028
First load or full build per source
Where the figures come from
- Capacity basis
- Utility, ISO, or government filing
- Investment basis
- Press reported
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- WTOC, July 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Four-building OpenAI campus at the Savannah Gateway Industrial Hub announced July 2026, backed by a 3.2 GW Georgia Power PPA and phased from 2028 through 2032.
Location
- Site
- Effingham County, GA
- Coordinates
- 32.30, -81.23
- State directory
- Data centers in Georgia (38 verified facilities)
Other tracked projects in Georgia
- Project Bunkhouse (Digital Realty)Bartow County, GA, 1.8 GW, announced
- AWS GeorgiaButts County, GA, 1.2 GW, announced
- Project Sail (Prologis)Coweta County, GA, 900 MW, announced
Cite this record
Rein, Malachi (2026). Project Camellia (OpenAI) (Effingham County, GA). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/openai-camellia-effingham-ga
@misc{malachienergy_openai_camellia_effingham_ga_2026,
author = {Rein, Malachi},
title = {Project Camellia (OpenAI) (Effingham County, GA)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Utility, ISO, or government filing. Investment basis: Press reported.},
url = {https://malachi.energy/data-centers/projects/openai-camellia-effingham-ga}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: utility, iso, or government filing. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.