Kingston Technology Hub (Thor Equities)

Proposed

Thor Equities · Kingston, GA

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Summary

Kingston Technology Hub (Thor Equities) in Kingston, GA is planned at 150 MW and about $1 billion, and is proposed, with a 2030 target as of October 2026. It ranks 55th of 56 tracked US mega projects by planned capacity, 0.1% of the 106.2 GW national total. The capacity figure is press or analyst reported; the investment figure is press reported. Confidence is low: the project is proposed without permits, or the capacity is an estimate. Malachi.Energy tracks 5 mega projects in Georgia in total.

Key figures

Planned capacity

150 MW

Press or analyst reported

Announced investment

$1 billion

Press reported

Status

Proposed

As of October 2026

Target year

2030

First load or full build per source

Where the figures come from

Capacity basis
Press or analyst reported
Investment basis
Press reported
Location basis
City centroid. The coordinate is a centroid that can sit several miles from the parcel, so no distance fact is stated for this project.
Confidence
Low: the project is proposed without permits, or the capacity is an estimate.
Counted in headline totals
Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
Primary source
Coosa Valley News, September 2026
Last verified
, dataset version 2026-10-03. Re-checked whenever the project list is refreshed.

Basis and confidence definitions are in the directory methodology.

What is known

Proposed 350,000 sq ft data center on about 559 acres in the Kingston area of Bartow County, filed for Georgia regional review in September 2026. Power would come through a MEAG Power request for proposals; the site still needs local approvals before construction, with completion targeted for 2030.

Location

Site
Kingston, GA
Coordinates
34.24, -84.94
State directory
Data centers in Georgia (38 verified facilities)

Other tracked projects in Georgia

Cite this record

Rein, Malachi (2026). Kingston Technology Hub (Thor Equities) (Kingston, GA). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/thor-kingston-ga

@misc{malachienergy_thor_kingston_ga_2026,
  author = {Rein, Malachi},
  title = {Kingston Technology Hub (Thor Equities) (Kingston, GA)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-10-03. Capacity basis: Press or analyst reported. Investment basis: Press reported.},
  url = {https://malachi.energy/data-centers/projects/thor-kingston-ga}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.