Stargate Michigan by OpenAI / Oracle / Related Digital in Saline Township, MI is planned at 1.4 GW and about $16 billion, and is under construction as of September 2026. It ranks 25th of 54 tracked US mega projects by planned capacity, 1.3% of the 109.2 GW national total. The capacity figure is utility, iso, or government filing; the investment figure is press reported. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. It is the only mega project Malachi.Energy tracks in Michigan.

Key figures

Planned capacity

1.4 GW

Utility, ISO, or government filing

Announced investment

$16 billion

Press reported

Status

Under construction

As of September 2026

Target year

Not stated

No public date

Where the figures come from

Capacity basis
Utility, ISO, or government filing
Investment basis
Press reported
Confidence
Medium: one figure is reported, estimated, or scoped differently than the campus.
Counted in headline totals
Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
Primary source
CNBC, June 2026
Last verified
, dataset version 2026-09-14. Re-checked at every data refresh.

Basis and confidence definitions are in the directory methodology.

What is known

Three 550,000 sq ft buildings in Washtenaw County with a 1.4 GW, 19-year DTE supply agreement and an Oracle-funded battery. Broke ground June 2026.

Location

Site
Saline Township, MI
Coordinates
42.10, -83.85
State directory
Data centers in Michigan (12 verified facilities)

Other tracked projects in Michigan

This is the only mega project Malachi.Energy tracks in Michigan.

Cite this record

Rein, Malachi (2026). Stargate Michigan (Saline Township, MI). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/stargate-saline-township-mi

@misc{malachienergy_stargate_saline_township_mi_2026,
  author = {Rein, Malachi},
  title = {Stargate Michigan (Saline Township, MI)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-09-14. Capacity basis: Utility, ISO, or government filing. Investment basis: Press reported.},
  url = {https://malachi.energy/data-centers/projects/stargate-saline-township-mi}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: utility, iso, or government filing. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.