Data Centers in Michigan
12 verified facilities · about 35 estimated ·
Michigan data centers at a glance
As of September 2026, Michigan has 12 data centers verified in OpenStreetMap and an estimated 35 in total. That ranks 30th among the 48 states and territories in the directory and is 0.7% of all verified US facilities. Facilities cluster in Detroit (2), Flint (1), and Lansing (1). The largest operators by mapped sites are Comcast (1), Dennis Sampier (1), and EdgeConneX (1), out of 6 named operators. Malachi.Energy also tracks 1 mega project in Michigan totaling 1.4 GW of planned capacity and about $16 billion in announced investment, led by Stargate Michigan (OpenAI / Oracle / Related Digital) in Saline Township, MI, 1.4 GW and about $16 billion, under construction.
Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Michigan electricity rates.
Verified
12
OSM-mapped facilities
Estimated
~35
Scaled to industry totals
Top hub
Detroit
2 verified facilities
Mega projects
1.4 GW
1 tracked, $16B announced
Map of data centers in Michigan
County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.
Top operators in Michigan
By OSM-verified facility count
- 1.Comcast1
- 2.Dennis Sampier1
- 3.EdgeConneX1
- 4.Quicken Loans1
- 5.US Signal1
Key hubs in Michigan
Cities with the most verified facilities
- 1.Detroit2
- 2.Flint1
- 3.Lansing1
- 4.Royal Oak1
- 5.Southgate1
Mega projects in Michigan
1 tracked project · 1.4 GW planned capacity · $16B announced
Stargate Michigan (Saline Township, MI)
OpenAI / Oracle / Related Digital
Three 550,000 sq ft buildings in Washtenaw County with a 1.4 GW, 19-year DTE supply agreement and an Oracle-funded battery. Broke ground June 2026.
Source: CNBC (Jun 2026)
All verified data centers in Michigan
12 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.
| Name | Operator | City | Address |
|---|---|---|---|
| Unnamed facility | Verizon Wireless | Detroit | 2436 Bagley Street |
| Unnamed facility | Quicken Loans | Detroit | 1401 Rosa Parks Boulevard |
| Unnamed facility | Unknown | Flint | 5225 Exchange Drive |
| Liquid Web, Inc | Unknown | Lansing | 2703 Ena Drive |
| Liberty Center One | Unknown | Royal Oak | 4815 Delemere Avenue |
| Comcast | Comcast | Southgate | 14312 Northline Road |
| Chick-fil-A Hiring Center | Dennis Sampier | Unknown | Not listed |
| EdgeConneX Detroit DET01 | EdgeConneX | Unknown | Not listed |
| Liquid Web | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | US Signal | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
Frequently asked questions
How many data centers are in Michigan?
Michigan has 12 data centers verified in OpenStreetMap as of September 2026, and an estimated 35 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 30th of 48 states and territories by verified count.
Where are the data centers in Michigan?
The largest concentrations in Michigan are Detroit with 2 verified facilities, Flint with 1 verified facility, Lansing with 1 verified facility, Royal Oak with 1 verified facility, and Southgate with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.
Who operates the most data centers in Michigan?
By number of OSM-verified facilities, the largest data center operators in Michigan are Comcast (1), Dennis Sampier (1), EdgeConneX (1), Quicken Loans (1), and US Signal (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.
What large data centers are being built in Michigan?
Malachi.Energy tracks 1 mega project in Michigan as of September 2026: Stargate Michigan (OpenAI / Oracle / Related Digital) in Saline Township, MI, 1.4 GW and about $16 billion, under construction. Together they total 1.4 GW of planned capacity and about $16 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.
Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.