Data Centers in Wisconsin

12 verified facilities · about 35 estimated ·

Wisconsin data centers at a glance

As of September 2026, Wisconsin has 12 data centers verified in OpenStreetMap and an estimated 35 in total. That ranks 31st among the 48 states and territories in the directory and is 0.7% of all verified US facilities. Facilities cluster in Milwaukee (2), Franklin (1), and Madison (1). The largest operators by mapped sites are Involta (1), Lumen Technologies (1), and WE Energies (1), out of 4 named operators. Malachi.Energy also tracks 3 mega projects in Wisconsin totaling 2.7 GW of planned capacity and about $23 billion in announced investment, led by Microsoft Wisconsin in Mount Pleasant, WI, 1.5 GW and about $7 billion, operational, targeted for 2026.

Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Wisconsin electricity rates.

Verified

12

OSM-mapped facilities

Estimated

~35

Scaled to industry totals

Top hub

Milwaukee

2 verified facilities

Mega projects

2.7 GW

3 tracked, $23B announced

Map of data centers in Wisconsin

County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.

Data centers in WisconsinMap of Wisconsin with county boundaries showing 12 verified facilities · 3 mega projects · 2.7 GW planned. Facilities from OpenStreetMap, mega projects from public filings, as of September 2026.Data centers in Wisconsin12 verified facilities · 3 mega projects · 2.7 GW plannedExpedient Milwaukee · FranklinUnnamed data center · MadisonUnnamed data center · West Wisconsin Telcom · MenomonieData Holdings Data Center · MilwaukeeTierPoint Milwaukee · MilwaukeePewaukee Data Center · WE Energies · WaukeshaLumen Madison 1 Data Center · Lumen TechnologiesMarquette-Adams Telephone CoopUnnamed data center · InvoltaUnnamed data centerUnnamed data centerUnnamed data centerMicrosoft Wisconsin · 1.5 GW · OperatingStargate Lighthouse · 1 GW · Under constructionMeta Beaver Dam · 220 MW · Under constructionVERIFIED FACILITIESData center mapped in OpenStreetMapMEGA PROJECTS BY STATUSOperatingUnder constructionAnnouncedProposedMARKER SIZE = PLANNED CAPACITY500 MW2 GW10 GWIN THIS FIGURE12 verified facilitiesTop hub: Milwaukee (2)Top operator: Involta3 mega projects, 2.7 GW$23.3B announced investmentSources: OpenStreetMap contributors (ODbL); mega projects from public filings and announcements, Malachi.Energy tally; boundaries US Census via us-atlas.malachi.energy/data-centers/wisconsin · Data updated September 2026

Top operators in Wisconsin

By OSM-verified facility count

  1. 1.Involta1
  2. 2.Lumen Technologies1
  3. 3.WE Energies1
  4. 4.West Wisconsin Telcom1

Key hubs in Wisconsin

Cities with the most verified facilities

  1. 1.Milwaukee2
  2. 2.Franklin1
  3. 3.Madison1
  4. 4.Menomonie1
  5. 5.Waukesha1

Mega projects in Wisconsin

3 tracked projects · 2.7 GW planned capacity · $23.3B announced

Microsoft Wisconsin (Mount Pleasant, WI)

Microsoft

Operational
1,500 MW$7.3B

Microsoft's Fairwater AI campus on the former Foxconn site. The first $3.3B facility became fully operational in June 2026; a second $4B facility is under construction for 2028.

Target: 2026Source: Wisconsin Public Radio (Jun 2026)

Stargate Lighthouse (Port Washington, WI)

Vantage / Oracle / OpenAI

Under Construction
1,000 MW$15B

Stargate site in Wisconsin operated by Vantage for Oracle and OpenAI, scalable to 3.5 GW in later phases.

Target: 2028Source: Epoch AI (Apr 2026)

Meta Beaver Dam (Dodge County, WI)

Meta

Under Construction
220 MW$1B

Meta's Dodge County campus broke ground in November 2025. Wisconsin's PSC approved the Alliant Energy supply deal in May 2026 at a 220 MW peak load.

Target: 2027Source: Wisconsin Watch (May 2026)

All verified data centers in Wisconsin

12 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.

OSM-verified data center facilities in Wisconsin
NameOperatorCityAddress
Expedient MilwaukeeUnknownFranklin4777 West Ironwood Drive
Unnamed facilityUnknownMadison2802 Sylvan Avenue
Unnamed facilityWest Wisconsin TelcomMenomonie816 6th Avenue
Data Holdings Data CenterUnknownMilwaukee3135 West Highland Boulevard
TierPoint MilwaukeeUnknownMilwaukee3701A West Burnham Street
Pewaukee Data CenterWE EnergiesWaukeshaW237N1500 Busse Road
Lumen Madison 1 Data CenterLumen TechnologiesUnknownNot listed
Marquette-Adams Telephone CoopUnknownUnknownNot listed
Unnamed facilityInvoltaUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed

Frequently asked questions

How many data centers are in Wisconsin?

Wisconsin has 12 data centers verified in OpenStreetMap as of September 2026, and an estimated 35 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 31st of 48 states and territories by verified count.

Where are the data centers in Wisconsin?

The largest concentrations in Wisconsin are Milwaukee with 2 verified facilities, Franklin with 1 verified facility, Madison with 1 verified facility, Menomonie with 1 verified facility, and Waukesha with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.

Who operates the most data centers in Wisconsin?

By number of OSM-verified facilities, the largest data center operators in Wisconsin are Involta (1), Lumen Technologies (1), WE Energies (1), and West Wisconsin Telcom (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.

What large data centers are being built in Wisconsin?

Malachi.Energy tracks 3 mega projects in Wisconsin as of September 2026: Microsoft Wisconsin in Mount Pleasant, WI, 1.5 GW and about $7 billion, operational, targeted for 2026; Stargate Lighthouse (Vantage / Oracle / OpenAI) in Port Washington, WI, 1.0 GW and about $15 billion, under construction, targeted for 2028; and Meta Beaver Dam in Dodge County, WI, 220 MW and about $1 billion, under construction, targeted for 2027. Together they total 2.7 GW of planned capacity and about $23 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.

All US data centers