Microsoft Wisconsin
OperationalMicrosoft · Mount Pleasant, WI
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Microsoft Wisconsin in Mount Pleasant, WI is planned at 1.5 GW and about $7.3 billion, and is operational, with a 2026 target as of September 2026. It ranks 22nd of 54 tracked US mega projects by planned capacity, 1.4% of the 109.2 GW national total. The capacity figure is press or analyst reported; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 3 mega projects in Wisconsin in total.
Key figures
1.5 GW
Press or analyst reported
$7.3 billion
Developer-stated campus cost
Operational
As of September 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Press or analyst reported
- Investment basis
- Developer-stated campus cost
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Wisconsin Public Radio, June 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Microsoft's Fairwater AI campus on the former Foxconn site. The first $3.3B facility became fully operational in June 2026; a second $4B facility is under construction for 2028.
Location
- Site
- Mount Pleasant, WI
- Coordinates
- 42.72, -87.87
- State directory
- Data centers in Wisconsin (12 verified facilities)
Other tracked projects in Wisconsin
- Stargate LighthousePort Washington, WI, 1.0 GW, under construction
- Meta Beaver DamDodge County, WI, 220 MW, under construction
Cite this record
Rein, Malachi (2026). Microsoft Wisconsin (Mount Pleasant, WI). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/microsoft-wisconsin
@misc{malachienergy_microsoft_wisconsin_2026,
author = {Rein, Malachi},
title = {Microsoft Wisconsin (Mount Pleasant, WI)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Press or analyst reported. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/microsoft-wisconsin}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.