Summary
Meta Beaver Dam in Dodge County, WI is planned at 220 MW and about $1 billion, and is under construction, with a 2027 target as of September 2026. It ranks 52nd of 54 tracked US mega projects by planned capacity, 0.2% of the 109.2 GW national total. The capacity figure is utility, iso, or government filing; the investment figure is developer-stated campus cost. Confidence is high: both figures come from the developer or a filing and the site has physical progress or firm contracts. Malachi.Energy tracks 3 mega projects in Wisconsin in total.
Key figures
220 MW
Utility, ISO, or government filing
$1 billion
Developer-stated campus cost
Under construction
As of September 2026
2027
First load or full build per source
Where the figures come from
- Capacity basis
- Utility, ISO, or government filing
- Investment basis
- Developer-stated campus cost
- Confidence
- High: both figures come from the developer or a filing and the site has physical progress or firm contracts.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- Wisconsin Watch, May 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Meta's Dodge County campus broke ground in November 2025. Wisconsin's PSC approved the Alliant Energy supply deal in May 2026 at a 220 MW peak load.
Location
- Site
- Dodge County, WI
- Coordinates
- 43.47, -88.84
- State directory
- Data centers in Wisconsin (12 verified facilities)
Other tracked projects in Wisconsin
- Microsoft WisconsinMount Pleasant, WI, 1.5 GW, operational
- Stargate LighthousePort Washington, WI, 1.0 GW, under construction
Cite this record
Rein, Malachi (2026). Meta Beaver Dam (Dodge County, WI). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/meta-beaver-dam
@misc{malachienergy_meta_beaver_dam_2026,
author = {Rein, Malachi},
title = {Meta Beaver Dam (Dodge County, WI)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Utility, ISO, or government filing. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/meta-beaver-dam}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: utility, iso, or government filing. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.