SpaceXAI Colossus in Memphis, TN is planned at 1.5 GW and about $18 billion, and is operational, with a 2026 target as of October 2026. It ranks 19th of 56 tracked US mega projects by planned capacity, 1.4% of the 106.2 GW national total. The capacity figure is press or analyst reported; the investment figure is press reported. Confidence is low: the project is proposed without permits, or the capacity is an estimate. It is the only mega project Malachi.Energy tracks in Tennessee.
Key figures
1.5 GW
Press or analyst reported
$18 billion
Press reported
Operational
As of October 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Press or analyst reported
- Investment basis
- Press reported
- Nearest high-voltage transmission
- The campus sits 0.3 miles from the nearest 500 kV transmission line, owned by Entergy Arkansas Inc, per HIFLD transmission data current to September 2023, computed 2026-10-02. 3 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 500 kV. Source: HIFLD
- Location basis
- Campus footprint identified. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: OpenStreetMap relation 16356926, xAI Colossus, 3231 Paul R Lowry Road.
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Introl, January 2026
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
Flagship AI supercomputer campus in Memphis, now under SpaceXAI after SpaceX absorbed xAI in February 2026: Colossus 1 on Paul R Lowry Road (about 500 MW, leased in full to Anthropic from May 2026) and Colossus 2 on Tulane Road (about 1 GW, live since January 2026), with a fourth hall announced in July 2026. The $18B is the reported cost of the cluster's GPUs, not construction; the Southaven, Mississippi building is listed separately.
Location
- Site
- Memphis, TN
- Coordinates
- 35.06, -90.16
- State directory
- Data centers in Tennessee (28 verified facilities)
Other tracked projects in Tennessee
This is the only mega project Malachi.Energy tracks in Tennessee.
Cite this record
Rein, Malachi (2026). SpaceXAI Colossus (Memphis, TN). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/xai-colossus-memphis
@misc{malachienergy_xai_colossus_memphis_2026,
author = {Rein, Malachi},
title = {SpaceXAI Colossus (Memphis, TN)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Press or analyst reported. Investment basis: Press reported.},
url = {https://malachi.energy/data-centers/projects/xai-colossus-memphis}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: press reported. Dataset version . Maintained by Malachi Rein for Malachi.Energy.