Data Centers in Tennessee
28 verified facilities · about 81 estimated ·
Tennessee data centers at a glance
As of September 2026, Tennessee has 28 data centers verified in OpenStreetMap and an estimated 81 in total. That ranks 15th among the 48 states and territories in the directory and is 1.6% of all verified US facilities. Facilities cluster in Franklin (2), Memphis (2), and Brentwood (1). The largest operators by mapped sites are Google (4), Meta (4), and Flexential (3), out of 8 named operators. Malachi.Energy also tracks 1 mega project in Tennessee totaling 2.0 GW of planned capacity and about $18 billion in announced investment, led by SpaceXAI Colossus in Memphis, TN, 2.0 GW and about $18 billion, operational, targeted for 2026.
Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Tennessee electricity rates.
Verified
28
OSM-mapped facilities
Estimated
~81
Scaled to industry totals
Top hub
Franklin
2 verified facilities
Mega projects
2.0 GW
1 tracked, $18B announced
Map of data centers in Tennessee
County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.
Top operators in Tennessee
By OSM-verified facility count
- 1.Google4
- 2.Meta4
- 3.Flexential3
- 4.xAI2
- 5.BNYM1
Key hubs in Tennessee
Cities with the most verified facilities
- 1.Franklin2
- 2.Memphis2
- 3.Brentwood1
- 4.Clarksville1
Mega projects in Tennessee
1 tracked project · 2.0 GW planned capacity · $18B announced
SpaceXAI Colossus (Memphis, TN)
SpaceXAI
Flagship AI supercomputer campus in Memphis, now under SpaceXAI after SpaceX absorbed xAI in February 2026. Colossus 2 went live in January 2026; Anthropic leases all of Colossus 1 (300+ MW) from May 2026, and a fourth Memphis hall was announced in July 2026.
Target: 2026Source: Introl (Jan 2026)
All verified data centers in Tennessee
28 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.
| Name | Operator | City | Address |
|---|---|---|---|
| Flexential Nashville - Brentwood | Flexential | Brentwood | 7100 Commerce Way |
| Google Montgomery Data Center | Google LLC | Clarksville | 1000 Boolean Drive |
| Flexential Nashville - Cool Springs | Flexential | Franklin | 425 Duke Drive |
| Flexential Nashville - Franklin | Flexential | Franklin | 4600 Carothers Parkway |
| xAI Colossus | xAI | Memphis | 3231 Paul R Lowery Road |
| xAI Macrohard Colossus 2 | xAI | Memphis | 5420 Tulane Road |
| DC Blox Chattanooga | Unknown | Unknown | Not listed |
| Flexential Brentwood Data Center | Unknown | Unknown | Not listed |
| Frontier (supercomputer) | Oak Ridge National Laboratory | Unknown | Not listed |
| Gallatin Data Center | Meta | Unknown | Not listed |
| Unknown | Not listed | ||
| Unknown | Not listed | ||
| HCA Information Technology & Services Data Center | Unknown | Unknown | Not listed |
| Meta Gallatin Data Center | Meta | Unknown | Not listed |
| Meta Gallatin Data Center | Meta | Unknown | Not listed |
| Meta Gallatin Data Center | Meta | Unknown | Not listed |
| Newrays Two LLC Mining | Unknown | Unknown | Not listed |
| SPC3A | Unknown | Not listed | |
| SPC4A | Unknown | Not listed | |
| Tennessee Processing Center LLC | Unknown | Unknown | Not listed |
| Tennessee South Data Center | State of Tennessee | Unknown | Not listed |
| TierPoint | Unknown | Unknown | Not listed |
| Verizon Wireless | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | BNYM | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
Frequently asked questions
How many data centers are in Tennessee?
Tennessee has 28 data centers verified in OpenStreetMap as of September 2026, and an estimated 81 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 15th of 48 states and territories by verified count.
Where are the data centers in Tennessee?
The largest concentrations in Tennessee are Franklin with 2 verified facilities, Memphis with 2 verified facilities, Brentwood with 1 verified facility, and Clarksville with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.
Who operates the most data centers in Tennessee?
By number of OSM-verified facilities, the largest data center operators in Tennessee are Google (4), Meta (4), Flexential (3), xAI (2), and BNYM (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.
What large data centers are being built in Tennessee?
Malachi.Energy tracks 1 mega project in Tennessee as of September 2026: SpaceXAI Colossus in Memphis, TN, 2.0 GW and about $18 billion, operational, targeted for 2026. Together they total 2.0 GW of planned capacity and about $18 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.
Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.