Data Centers in Tennessee

28 verified facilities · about 90 estimated ·

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Tennessee data centers at a glance

As of October 2026, Tennessee has 28 data centers verified in OpenStreetMap and an estimated 90 in total. That ranks 15th among the 48 states and territories in the directory and is 1.6% of all verified US facilities. Facilities cluster in Franklin (2), Memphis (2), and Brentwood (1). The largest operators by mapped sites are Google (4), Meta (4), and Flexential (3), out of 8 named operators. Malachi.Energy also tracks 1 mega project in Tennessee totaling 1.5 GW of planned capacity and about $18 billion in announced investment, led by SpaceXAI Colossus in Memphis, TN, 1.5 GW and about $18 billion, operational, targeted for 2026. SpaceXAI Colossus, the one tracked project in Tennessee with a site-level location, sits 0.3 miles from the nearest 500 kV transmission line (Entergy Arkansas Inc), per HIFLD transmission data current to September 2023, computed 2026-10-02.

Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Tennessee electricity rates.

Verified

28

OSM-mapped facilities

Estimated

~90

Scaled to industry totals

Top hub

Franklin

2 verified facilities

Mega projects

1.5 GW

1 tracked, $18B announced

Map of data centers in Tennessee

County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.

Data centers in TennesseeMap of Tennessee with county boundaries showing 28 verified facilities · 1 mega project · 1.5 GW planned. Facilities from OpenStreetMap, mega projects from public filings, as of October 2026.Data centers in Tennessee28 verified facilities · 1 mega project · 1.5 GW plannedHCA Information Technology & Services Data Center · AntiochUnnamed data center · Bean StationFlexential Brentwood Data Center · BrentwoodFlexential Nashville - Brentwood · Flexential · BrentwoodUnnamed data center · BrentwoodDC Blox Chattanooga · ChattanoogaGoogle Montgomery Data Center · Google LLC · ClarksvilleFlexential Nashville - Cool Springs · Flexential · FranklinFlexential Nashville - Franklin · Flexential · FranklinTierPoint · FranklinMeta Gallatin Data Center · Meta · GallatinxAI Colossus · xAI · MemphisxAI Macrohard Colossus 2 · xAI · MemphisTennessee Processing Center LLC · NashvilleUnnamed data center · NashvilleUnnamed data center · BNYM · NashvilleNewrays Two LLC Mining · ParisTennessee South Data Center · State of Tennessee · SmyrnaFrontier (supercomputer) · Oak Ridge National LaboratoryGallatin Data Center · MetaGoogle · GoogleGoogle · GoogleMeta Gallatin Data Center · MetaMeta Gallatin Data Center · MetaSPC3A · GoogleSPC4A · GoogleVerizon WirelessUnnamed data centerSpaceXAI Colossus · 1.5 GW · OperatingVERIFIED FACILITIESData center mapped in OpenStreetMapMEGA PROJECTS BY STATUSOperatingUnder constructionAnnouncedProposedMARKER SIZE = PLANNED CAPACITY500 MW2 GW10 GWIN THIS FIGURE28 verified facilitiesTop hub: Franklin (2)Top operator: Google1 mega project, 1.5 GW$18B announced investmentSources: OpenStreetMap contributors (ODbL); mega projects from public filings and announcements, Malachi.Energy tally; boundaries US Census via us-atlas.malachi.energy/data-centers/tennessee · Data updated October 2026

Top operators in Tennessee

By OSM-verified facility count

  1. 1.Google4
  2. 2.Meta4
  3. 3.Flexential3
  4. 4.xAI2
  5. 5.BNYM1

Key hubs in Tennessee

Cities with the most verified facilities

  1. 1.Franklin2
  2. 2.Memphis2
  3. 3.Brentwood1
  4. 4.Clarksville1

Mega projects in Tennessee

1 tracked project · 1.5 GW planned capacity · $18B announced

SpaceXAI Colossus (Memphis, TN)

SpaceXAI

Operational
1,500 MW$18B

Flagship AI supercomputer campus in Memphis, now under SpaceXAI after SpaceX absorbed xAI in February 2026: Colossus 1 on Paul R Lowry Road (about 500 MW, leased in full to Anthropic from May 2026) and Colossus 2 on Tulane Road (about 1 GW, live since January 2026), with a fourth hall announced in July 2026. The $18B is the reported cost of the cluster's GPUs, not construction; the Southaven, Mississippi building is listed separately.

Target: 2026Source: Introl (Jan 2026)Basis: press or analyst reported MW, press reportedDetails & sources

All verified data centers in Tennessee

28 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.

OSM-verified data center facilities in Tennessee
NameOperatorCityAddress
HCA Information Technology & Services Data CenterUnknownAntioch5900 Crossings Boulevard (address point)
Unnamed facilityUnknownBean Station5520 Highway 11w South (address point)
Flexential Brentwood Data CenterUnknownBrentwood7100 Commerce Way (address point)
Flexential Nashville - BrentwoodFlexentialBrentwood7100 Commerce Way
Unnamed facilityUnknownBrentwood402 Franklin Road (address point)
DC Blox ChattanoogaUnknownChattanooga807 East 16th Street (address point)
Google Montgomery Data CenterGoogle LLCClarksville1000 Boolean Drive
Flexential Nashville - Cool SpringsFlexentialFranklin425 Duke Drive
Flexential Nashville - FranklinFlexentialFranklin4600 Carothers Parkway
TierPointUnknownFranklin311 Eddy Lane (address point)
Meta Gallatin Data CenterMetaGallatin1 GTN5 Meta Loop (address point)
xAI ColossusxAIMemphis3231 Paul R Lowery Road
xAI Macrohard Colossus 2xAIMemphis5420 Tulane Road
Tennessee Processing Center LLCUnknownNashville420 Woodfolk Avenue (address point)
Unnamed facilityUnknownNashville1301 4th Avenue South (address point)
Unnamed facilityBNYMNashville420 Woodfolk Avenue (address point)
Newrays Two LLC MiningUnknownParis50 Old Paris Murray Road (address point)
Tennessee South Data CenterState of TennesseeSmyrna92 Weakley Lane (address point)
Frontier (supercomputer)Oak Ridge National LaboratoryUnknownNot listed
Gallatin Data CenterMetaUnknownNot listed
GoogleGoogleUnknownNot listed
GoogleGoogleUnknownNot listed
Meta Gallatin Data CenterMetaUnknownNot listed
Meta Gallatin Data CenterMetaUnknownNot listed
SPC3AGoogleUnknownNot listed
SPC4AGoogleUnknownNot listed
Verizon WirelessUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed

Frequently asked questions

How many data centers are in Tennessee?

Tennessee has 28 data centers verified in OpenStreetMap as of October 2026, and an estimated 90 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 15th of 48 states and territories by verified count.

Where are the data centers in Tennessee?

The largest concentrations in Tennessee are Franklin with 2 verified facilities, Memphis with 2 verified facilities, Brentwood with 1 verified facility, and Clarksville with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.

Who operates the most data centers in Tennessee?

By number of OSM-verified facilities, the largest data center operators in Tennessee are Google (4), Meta (4), Flexential (3), xAI (2), and BNYM (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.

What large data centers are being built in Tennessee?

Malachi.Energy tracks 1 mega project in Tennessee as of October 2026: SpaceXAI Colossus in Memphis, TN, 1.5 GW and about $18 billion, operational, targeted for 2026. Together they total 1.5 GW of planned capacity and about $18 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.

All US data centers

Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.