Data Centers in North Carolina
26 verified facilities · about 75 estimated ·
North Carolina data centers at a glance
As of September 2026, North Carolina has 26 data centers verified in OpenStreetMap and an estimated 75 in total. That ranks 16th among the 48 states and territories in the directory and is 1.5% of all verified US facilities. Facilities cluster in Charlotte (4), Durham (4), and Asheville (1). The largest operators by mapped sites are Meta (4), Flexential (3), and CyrusOne (2), out of 5 named operators. Malachi.Energy also tracks 1 mega project in North Carolina totaling 1.0 GW of planned capacity and about $10 billion in announced investment, led by AWS Richmond County (Amazon Web Services) in Rockingham, NC, 1.0 GW and about $10 billion, under construction, targeted for 2028.
Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also North Carolina electricity rates.
Verified
26
OSM-mapped facilities
Estimated
~75
Scaled to industry totals
Top hub
Charlotte
4 verified facilities
Mega projects
1.0 GW
1 tracked, $10B announced
Map of data centers in North Carolina
County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.
Top operators in North Carolina
By OSM-verified facility count
- 1.Meta4
- 2.Flexential3
- 3.CyrusOne2
- 4.Duke Libraries1
- 5.TierPoint1
Key hubs in North Carolina
Cities with the most verified facilities
- 1.Charlotte4
- 2.Durham4
- 3.Asheville1
- 4.Cary1
- 5.Kings Mountain1
Mega projects in North Carolina
1 tracked project · 1.0 GW planned capacity · $10B announced
AWS Richmond County (Rockingham, NC)
Amazon Web Services
AWS's $10B data center complex in Richmond County, North Carolina, adjacent to a 2.24 GW Duke Energy plant.
Target: 2028Source: NC DEQ (Jun 2026)
All verified data centers in North Carolina
26 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.
| Name | Operator | City | Address |
|---|---|---|---|
| DartPoints Asheville | Unknown | Asheville | 100 Technology Drive |
| iGLASS Networks | Unknown | Cary | 211 Commonwealth Court |
| Flexential Charlotte - North | Flexential | Charlotte | 10105 David Taylor Drive |
| Flexential Charlotte - South | Flexential | Charlotte | 8910 Lenox Pointe Drive |
| SEGRA | Unknown | Charlotte | 1612 Cross Beam Drive |
| Spectrum Charlotte National Data Center | Unknown | Charlotte | 8730 Green Ridge Drive |
| Level 3 Communications | Unknown | Durham | 5400 South Miami Boulevard |
| Windstream Communications | Unknown | Durham | 5400 South Miami Boulevard |
| Unnamed facility | CyrusOne | Durham | 2223 Northeast Creek Parkway |
| Unnamed facility | CyrusOne | Durham | 2223 Northeast Creek Parkway |
| T5 Charlotte Campus | Unknown | Kings Mountain | 131 Riverside Court |
| Flexential Raleigh | Flexential | Morrisville | 5150 McCrimmon Parkway |
| Segra Data Center | Unknown | Raleigh | 2100 Garner Station Boulevard |
| BB&T Data Center | Unknown | Unknown | Not listed |
| Brandaleone Lab for Data and Visualization | Duke Libraries | Unknown | Not listed |
| Meta | Meta | Unknown | Not listed |
| Meta | Meta | Unknown | Not listed |
| Meta | Meta | Unknown | Not listed |
| Meta | Meta | Unknown | Not listed |
| TierPoint - Charlotte Data Center | TierPoint | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
| Unnamed facility | Unknown | Unknown | Not listed |
Frequently asked questions
How many data centers are in North Carolina?
North Carolina has 26 data centers verified in OpenStreetMap as of September 2026, and an estimated 75 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 16th of 48 states and territories by verified count.
Where are the data centers in North Carolina?
The largest concentrations in North Carolina are Charlotte with 4 verified facilities, Durham with 4 verified facilities, Asheville with 1 verified facility, Cary with 1 verified facility, and Kings Mountain with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.
Who operates the most data centers in North Carolina?
By number of OSM-verified facilities, the largest data center operators in North Carolina are Meta (4), Flexential (3), CyrusOne (2), Duke Libraries (1), and TierPoint (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.
What large data centers are being built in North Carolina?
Malachi.Energy tracks 1 mega project in North Carolina as of September 2026: AWS Richmond County (Amazon Web Services) in Rockingham, NC, 1.0 GW and about $10 billion, under construction, targeted for 2028. Together they total 1.0 GW of planned capacity and about $10 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.
Facility data sourced from OpenStreetMap contributors (ODbL). Estimated totals scaled to Baxtel industry counts. Mega project data from public filings and announcements. Dataset last updated . Built by Malachi.Energy.