10 verified facilities · about 29 estimated ·

Mississippi data centers at a glance

As of September 2026, Mississippi has 10 data centers verified in OpenStreetMap and an estimated 29 in total. That ranks 33rd among the 48 states and territories in the directory and is 0.6% of all verified US facilities. Facilities cluster in Memphis (1). The largest operators by mapped sites are Amazon Web Services (4) and xAI (1), out of 2 named operators. Malachi.Energy also tracks 4 mega projects in Mississippi totaling 4.1 GW of planned capacity and about $57 billion in announced investment, led by SpaceXAI MACROHARDRR in Southaven, MS, 2.0 GW and about $20 billion, under construction, targeted for 2026.

Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Mississippi electricity rates.

Verified

10

OSM-mapped facilities

Estimated

~29

Scaled to industry totals

Top hub

Memphis

1 verified facilities

Mega projects

4.1 GW

4 tracked, $57B announced

Map of data centers in Mississippi

County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.

Data centers in MississippiMap of Mississippi with county boundaries showing 10 verified facilities · 4 mega projects · 4.1 GW planned. Facilities from OpenStreetMap, mega projects from public filings, as of September 2026.Data centers in Mississippi10 verified facilities · 4 mega projects · 4.1 GW plannedxAI Macrohardrr · xAI · MemphisAmazon Web Services · Amazon Web ServicesAmazon Web Services · Amazon Web ServicesAmazon Web Services · Amazon Web ServicesAmazon Web Services · Amazon Web ServicesUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerUnnamed data centerSpaceXAI MACROHARDRR · 2 GW · Under constructionAWS Mississippi · 1.5 GW · OperatingCompass Meridian · 500 MW · Under constructionAVAIO Digital Brandon · 116 MW · Under constructionVERIFIED FACILITIESData center mapped in OpenStreetMapMEGA PROJECTS BY STATUSOperatingUnder constructionAnnouncedProposedMARKER SIZE = PLANNED CAPACITY500 MW2 GW10 GWIN THIS FIGURE10 verified facilitiesTop hub: Memphis (1)Top operator: Amazon Web Services4 mega projects, 4.1 GW$57B announced investmentSources: OpenStreetMap contributors (ODbL); mega projects from public filings and announcements, Malachi.Energy tally; boundaries US Census via us-atlas.malachi.energy/data-centers/mississippi · Data updated September 2026

Top operators in Mississippi

By OSM-verified facility count

  1. 1.Amazon Web Services4
  2. 2.xAI1

Key hubs in Mississippi

Cities with the most verified facilities

  1. 1.Memphis1

Mega projects in Mississippi

4 tracked projects · 4.1 GW planned capacity · $57B announced

SpaceXAI MACROHARDRR (Southaven, MS)

SpaceXAI

Under Construction
2,000 MW$20B

SpaceXAI's Mississippi expansion adjacent to the Memphis Colossus complex, an 810,000 sq ft warehouse retrofit approaching 2 GW across the cluster by late 2026. Temporary gas turbines are being removed through mid-2027 in favor of a permanent 1.2 GW plant permitted in March 2026.

Target: 2026Source: Baxtel (Jul 2026)

AWS Mississippi (Madison County, MS)

Amazon Web Services

Operational
1,500 MW$21B

AWS's Madison County campus: five Canton buildings complete, with a further $11B commitment added in April 2026 (about $25B statewide). No megawatt figure has been published; capacity is an estimate.

Target: 2027Source: WLBT (Aug 2026)

Compass Meridian (Meridian, MS)

Compass Datacenters

Under Construction
500 MW$10B

Compass Datacenters' 8-building campus in Lauderdale County, Mississippi, built over an 8-year phased timeline.

Target: 2033Source: WTOK (Jul 2026)

AVAIO Digital Brandon (Brandon, MS)

AVAIO Digital

Under Construction
116 MW$6B

AVAIO Digital's $6B, 116 MW campus on 175 acres in Rankin County broke ground in September 2025 with Yates Construction. Occupancy targeted for the first half of 2027, powered by Entergy Mississippi.

Target: 2027Source: AVAIO Digital (Sep 2025)

All verified data centers in Mississippi

10 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.

OSM-verified data center facilities in Mississippi
NameOperatorCityAddress
xAI MacrohardrrxAIMemphisStateline Road West
Amazon Web ServicesAmazon Web ServicesUnknownNot listed
Amazon Web ServicesAmazon Web ServicesUnknownNot listed
Amazon Web ServicesAmazon Web ServicesUnknownNot listed
Amazon Web ServicesAmazon Web ServicesUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed
Unnamed facilityUnknownUnknownNot listed

Frequently asked questions

How many data centers are in Mississippi?

Mississippi has 10 data centers verified in OpenStreetMap as of September 2026, and an estimated 29 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 33rd of 48 states and territories by verified count.

Where are the data centers in Mississippi?

The largest concentrations in Mississippi are Memphis with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.

Who operates the most data centers in Mississippi?

By number of OSM-verified facilities, the largest data center operators in Mississippi are Amazon Web Services (4) and xAI (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.

What large data centers are being built in Mississippi?

Malachi.Energy tracks 4 mega projects in Mississippi as of September 2026: SpaceXAI MACROHARDRR in Southaven, MS, 2.0 GW and about $20 billion, under construction, targeted for 2026; AWS Mississippi (Amazon Web Services) in Madison County, MS, 1.5 GW and about $21 billion, operational, targeted for 2027; Compass Meridian (Compass Datacenters) in Meridian, MS, 500 MW and about $10 billion, under construction, targeted for 2033; and AVAIO Digital Brandon in Brandon, MS, 116 MW and about $6 billion, under construction, targeted for 2027. Together they total 4.1 GW of planned capacity and about $57 billion in announced investment. Figures are planned capacity from public filings and announcements, not delivered power.

All US data centers