AVAIO Digital Brandon
Under ConstructionAVAIO Digital · Brandon, MS
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
AVAIO Digital Brandon in Brandon, MS is planned at 116 MW and about $6 billion, and is under construction, with a 2027 target as of September 2026. It ranks 54th of 54 tracked US mega projects by planned capacity, 0.1% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is high: both figures come from the developer or a filing and the site has physical progress or firm contracts. Malachi.Energy tracks 4 mega projects in Mississippi in total.
Key figures
116 MW
Developer disclosed
$6 billion
Developer-stated campus cost
Under construction
As of September 2026
2027
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Developer-stated campus cost
- Confidence
- High: both figures come from the developer or a filing and the site has physical progress or firm contracts.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- AVAIO Digital, September 2025
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
AVAIO Digital's $6B, 116 MW campus on 175 acres in Rankin County broke ground in September 2025 with Yates Construction. Occupancy targeted for the first half of 2027, powered by Entergy Mississippi.
Location
- Site
- Brandon, MS
- Coordinates
- 32.27, -89.99
- State directory
- Data centers in Mississippi (10 verified facilities)
Other tracked projects in Mississippi
- SpaceXAI MACROHARDRRSouthaven, MS, 2.0 GW, under construction
- AWS MississippiMadison County, MS, 1.5 GW, operational
- Compass MeridianMeridian, MS, 500 MW, under construction
Cite this record
Rein, Malachi (2026). AVAIO Digital Brandon (Brandon, MS). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/avaio-brandon-ms
@misc{malachienergy_avaio_brandon_ms_2026,
author = {Rein, Malachi},
title = {AVAIO Digital Brandon (Brandon, MS)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/avaio-brandon-ms}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.