AVAIO Digital Brandon

Under Construction

AVAIO Digital · Brandon, MS

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Summary

AVAIO Digital Brandon in Brandon, MS is planned at 116 MW and about $6 billion, and is under construction, with a 2027 target as of September 2026. It ranks 54th of 54 tracked US mega projects by planned capacity, 0.1% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is high: both figures come from the developer or a filing and the site has physical progress or firm contracts. Malachi.Energy tracks 4 mega projects in Mississippi in total.

Key figures

Planned capacity

116 MW

Developer disclosed

Announced investment

$6 billion

Developer-stated campus cost

Status

Under construction

As of September 2026

Target year

2027

First load or full build per source

Where the figures come from

Capacity basis
Developer disclosed
Investment basis
Developer-stated campus cost
Confidence
High: both figures come from the developer or a filing and the site has physical progress or firm contracts.
Counted in headline totals
Yes. The investment figure is developer-stated campus cost and is comparable across projects.
Primary source
AVAIO Digital, September 2025
Last verified
, dataset version 2026-09-14. Re-checked at every data refresh.

Basis and confidence definitions are in the directory methodology.

What is known

AVAIO Digital's $6B, 116 MW campus on 175 acres in Rankin County broke ground in September 2025 with Yates Construction. Occupancy targeted for the first half of 2027, powered by Entergy Mississippi.

Location

Site
Brandon, MS
Coordinates
32.27, -89.99
State directory
Data centers in Mississippi (10 verified facilities)

Other tracked projects in Mississippi

Cite this record

Rein, Malachi (2026). AVAIO Digital Brandon (Brandon, MS). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/avaio-brandon-ms

@misc{malachienergy_avaio_brandon_ms_2026,
  author = {Rein, Malachi},
  title = {AVAIO Digital Brandon (Brandon, MS)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
  url = {https://malachi.energy/data-centers/projects/avaio-brandon-ms}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.