Compass Meridian
Under ConstructionCompass Datacenters · Meridian, MS
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Compass Meridian by Compass Datacenters in Meridian, MS is planned at 500 MW and about $10 billion, and is under construction, with a 2033 target as of September 2026. It ranks 46th of 54 tracked US mega projects by planned capacity, 0.5% of the 109.2 GW national total. The capacity figure is press or analyst reported; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 4 mega projects in Mississippi in total.
Key figures
500 MW
Press or analyst reported
$10 billion
Developer-stated campus cost
Under construction
As of September 2026
2033
First load or full build per source
Where the figures come from
- Capacity basis
- Press or analyst reported
- Investment basis
- Developer-stated campus cost
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is developer-stated campus cost and is comparable across projects.
- Primary source
- WTOK, July 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Compass Datacenters' 8-building campus in Lauderdale County, Mississippi, built over an 8-year phased timeline.
Location
- Site
- Meridian, MS
- Coordinates
- 32.36, -88.70
- State directory
- Data centers in Mississippi (10 verified facilities)
Other tracked projects in Mississippi
- SpaceXAI MACROHARDRRSouthaven, MS, 2.0 GW, under construction
- AWS MississippiMadison County, MS, 1.5 GW, operational
- AVAIO Digital BrandonBrandon, MS, 116 MW, under construction
Cite this record
Rein, Malachi (2026). Compass Meridian (Meridian, MS). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/compass-meridian-ms
@misc{malachienergy_compass_meridian_ms_2026,
author = {Rein, Malachi},
title = {Compass Meridian (Meridian, MS)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Press or analyst reported. Investment basis: Developer-stated campus cost.},
url = {https://malachi.energy/data-centers/projects/compass-meridian-ms}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.