Meta Prometheus
OperationalMeta · New Albany, OH
Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version
Summary
Meta Prometheus in New Albany, OH is planned at 1.0 GW and about $10 billion, and is operational, with a 2026 target as of September 2026. It ranks 32nd of 54 tracked US mega projects by planned capacity, 0.9% of the 109.2 GW national total. The capacity figure is developer disclosed; the investment figure is third-party analyst estimate. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 3 mega projects in Ohio in total.
Key figures
1.0 GW
Developer disclosed
$10 billion
Third-party analyst estimate
Operational
As of September 2026
2026
First load or full build per source
Where the figures come from
- Capacity basis
- Developer disclosed
- Investment basis
- Third-party analyst estimate
- Confidence
- Medium: one figure is reported, estimated, or scoped differently than the campus.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Epoch AI, September 2026
- Last verified
- , dataset version 2026-09-14. Re-checked at every data refresh.
Basis and confidence definitions are in the directory methodology.
What is known
Meta's Ohio AI campus in the New Albany data center corridor. About 560 MW of IT load operational as of September 2026, with full buildout projected for early 2027.
Location
- Site
- New Albany, OH
- Coordinates
- 40.08, -82.80
- State directory
- Data centers in Ohio (91 verified facilities)
Other tracked projects in Ohio
- PORTS-Pike Technology CampusPiketon, OH, 8.0 GW, announced
- Stargate LordstownLordstown, OH, 300 MW, under construction
Cite this record
Rein, Malachi (2026). Meta Prometheus (New Albany, OH). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/meta-prometheus
@misc{malachienergy_meta_prometheus_2026,
author = {Rein, Malachi},
title = {Meta Prometheus (New Albany, OH)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-09-14. Capacity basis: Developer disclosed. Investment basis: Third-party analyst estimate.},
url = {https://malachi.energy/data-centers/projects/meta-prometheus}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: third-party analyst estimate. Dataset version . Maintained by Malachi Rein for Malachi.Energy.