Stargate Lordstown by SoftBank / OpenAI in Lordstown, OH is planned at 300 MW and about $3 billion, and is under construction, with a 2027 target as of October 2026. It ranks 50th of 56 tracked US mega projects by planned capacity, 0.3% of the 106.2 GW national total. The capacity figure is press or analyst reported; the investment figure is third-party analyst estimate. Confidence is low: the project is proposed without permits, or the capacity is an estimate. Malachi.Energy tracks 3 mega projects in Ohio in total.
Key figures
300 MW
Press or analyst reported
$3 billion
Third-party analyst estimate
Under construction
As of October 2026
2027
First load or full build per source
Where the figures come from
- Capacity basis
- Press or analyst reported
- Investment basis
- Third-party analyst estimate
- Nearest high-voltage transmission
- The campus sits 0.7 miles from the nearest 345 kV transmission line, owned by American Transmission Systems, Inc., per HIFLD transmission data current to September 2023, computed 2026-10-02. 7 line segments rated 230 kV or higher pass within 5 miles of the campus, the highest at 345 kV. Source: HIFLD
- Location basis
- Campus footprint identified. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: Wikipedia.
- Confidence
- Low: the project is proposed without permits, or the capacity is an estimate.
- Counted in headline totals
- Yes. The investment figure is not developer-stated campus cost, so it is listed as announced rather than comparable spend.
- Primary source
- Epoch AI, April 2026
- Last verified
- , dataset version 2026-10-03. Re-checked whenever the project list is refreshed.
Basis and confidence definitions are in the directory methodology.
What is known
Stargate site at the former Lordstown Motors plant, mostly a SoftBank and Foxconn modular equipment factory with under 300 MW of compute. The 1.5 GW previously listed combined Lordstown with Milam County.
Location
- Site
- Lordstown, OH
- Coordinates
- 41.15, -80.88
- State directory
- Data centers in Ohio (91 verified facilities)
Other tracked projects in Ohio
- PORTS-Pike Technology CampusPiketon, OH, 8.0 GW, announced
- Meta PrometheusNew Albany, OH, 1.0 GW, operational
Cite this record
Rein, Malachi (2026). Stargate Lordstown (Lordstown, OH). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/stargate-lordstown
@misc{malachienergy_stargate_lordstown_2026,
author = {Rein, Malachi},
title = {Stargate Lordstown (Lordstown, OH)},
howpublished = {US Data Center Directory, Malachi.Energy},
year = {2026},
note = {Dataset version 2026-10-03. Capacity basis: Press or analyst reported. Investment basis: Third-party analyst estimate.},
url = {https://malachi.energy/data-centers/projects/stargate-lordstown}
}Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: third-party analyst estimate. Dataset version . Maintained by Malachi Rein for Malachi.Energy.