Data Centers in Kansas

7 verified facilities · about 20 estimated ·

Kansas data centers at a glance

As of September 2026, Kansas has 7 data centers verified in OpenStreetMap and an estimated 20 in total. That ranks 34th among the 48 states and territories in the directory and is 0.4% of all verified US facilities. Facilities cluster in Lenexa (2), Olathe (2), and Hays (1). The largest operators by mapped sites are SC (1) and TierPoint (1), out of 2 named operators. Malachi.Energy does not currently track a named mega project in Kansas; the tracked list covers announced campuses of roughly 100 MW and up where both planned capacity and investment are public.

Facility counts: OpenStreetMap contributors (ODbL), scaled to Baxtel data center market directory totals. Mega projects: Malachi.Energy tally of public filings and announcements. Method notes on the methodology page. See also Kansas electricity rates.

Verified

7

OSM-mapped facilities

Estimated

~20

Scaled to industry totals

Top hub

Lenexa

2 verified facilities

Mega projects

None

No tracked projects over 100 MW

Map of data centers in Kansas

County boundaries, every verified facility, and tracked mega projects sized by planned capacity. Downloads carry the source line and dataset date for citation.

Data centers in KansasMap of Kansas with county boundaries showing 7 verified facilities · no tracked mega projects. Facilities from OpenStreetMap, mega projects from public filings, as of September 2026.Data centers in Kansas7 verified facilities · no tracked mega projectsCloud Storage Corp · HaysData Center Lenexa · LenexaUnnamed data center · LenexaUnnamed data center · SC · Medicine LodgeU.S. Bank National Data Process Center · OlatheUnnamed data center · OlatheUnnamed data center · TierPointVERIFIED FACILITIESData center mapped in OpenStreetMapMEGA PROJECTS BY STATUSOperatingUnder constructionAnnouncedProposedMARKER SIZE = PLANNED CAPACITY500 MW2 GW10 GWIN THIS FIGURE7 verified facilitiesTop hub: Lenexa (2)Top operator: SCNo tracked projects over 100 MWSources: OpenStreetMap contributors (ODbL); mega projects from public filings and announcements, Malachi.Energy tally; boundaries US Census via us-atlas.malachi.energy/data-centers/kansas · Data updated September 2026

Top operators in Kansas

By OSM-verified facility count

  1. 1.SC1
  2. 2.TierPoint1

Key hubs in Kansas

Cities with the most verified facilities

  1. 1.Lenexa2
  2. 2.Olathe2
  3. 3.Hays1
  4. 4.Medicine Lodge1

All verified data centers in Kansas

7 facilities mapped in OpenStreetMap, sorted by city. Unnamed entries are mapped buildings tagged as data centers without a public name.

OSM-verified data center facilities in Kansas
NameOperatorCityAddress
Cloud Storage CorpUnknownHays1305 Canterbury Drive
Data Center LenexaUnknownLenexa11200 Lakeview Avenue
Unnamed facilityUnknownLenexa15725 College Boulevard
Unnamed facilitySCMedicine Lodge215 South Iliff Street
U.S. Bank National Data Process CenterUnknownOlathe24101 West Valley Parkway
Unnamed facilityUnknownOlathe23800 West Valley Parkway
Unnamed facilityTierPointUnknownNot listed

Frequently asked questions

How many data centers are in Kansas?

Kansas has 7 data centers verified in OpenStreetMap as of September 2026, and an estimated 20 in total once unmapped facilities are scaled in against Baxtel's industry count. That places it 34th of 48 states and territories by verified count.

Where are the data centers in Kansas?

The largest concentrations in Kansas are Lenexa with 2 verified facilities, Olathe with 2 verified facilities, Hays with 1 verified facility, and Medicine Lodge with 1 verified facility. The full table below lists every verified facility in the state with its operator and address.

Who operates the most data centers in Kansas?

By number of OSM-verified facilities, the largest data center operators in Kansas are SC (1) and TierPoint (1). This ranks mapped sites, not megawatts, so a hyperscaler with many small buildings can outrank a colocation provider with one large campus.

What large data centers are being built in Kansas?

Malachi.Energy does not currently track a named mega project in Kansas; the tracked list covers announced campuses of roughly 100 MW and up where both planned capacity and investment are public. Smaller and unannounced facilities still appear in the verified directory above. Nationally, US data centers used about 192 TWh in 2024, 4.7% of US electricity.