AWS New Carlisle

Operational

Amazon Web Services · New Carlisle, IN

Maintained and reviewed by Malachi Rein, LEED AP BD+CDataset version

Summary

AWS New Carlisle by Amazon Web Services in New Carlisle, IN is planned at 2.2 GW and about $11 billion, and is operational, with a 2027 target as of September 2026. It ranks 10th of 54 tracked US mega projects by planned capacity, 2% of the 109.2 GW national total. The capacity figure is press or analyst reported; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 4 mega projects in Indiana in total.

Key figures

Planned capacity

2.2 GW

Press or analyst reported

Announced investment

$11 billion

Developer-stated campus cost

Status

Operational

As of September 2026

Target year

2027

First load or full build per source

Where the figures come from

Capacity basis
Press or analyst reported
Investment basis
Developer-stated campus cost
Confidence
Medium: one figure is reported, estimated, or scoped differently than the campus.
Counted in headline totals
Yes. The investment figure is developer-stated campus cost and is comparable across projects.
Primary source
Measured AI, June 2026
Last verified
, dataset version 2026-09-14. Re-checked at every data refresh.

Basis and confidence definitions are in the directory methodology.

What is known

AWS hyperscale campus in northern Indiana: 18 of 32 planned buildings operational and 14 under construction as of mid-2026, drawing about 2.2 GW at full buildout no earlier than late 2027.

Location

Site
New Carlisle, IN
Coordinates
41.68, -86.48
State directory
Data centers in Indiana (14 verified facilities)

Other tracked projects in Indiana

Cite this record

Rein, Malachi (2026). AWS New Carlisle (New Carlisle, IN). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/aws-new-carlisle

@misc{malachienergy_aws_new_carlisle_2026,
  author = {Rein, Malachi},
  title = {AWS New Carlisle (New Carlisle, IN)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-09-14. Capacity basis: Press or analyst reported. Investment basis: Developer-stated campus cost.},
  url = {https://malachi.energy/data-centers/projects/aws-new-carlisle}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.