Meta Lebanon in Lebanon, IN is planned at 1.0 GW and about $10 billion, and is under construction, with a 2027 target as of October 2026. It ranks 31st of 56 tracked US mega projects by planned capacity, 0.9% of the 106.2 GW national total. The capacity figure is developer disclosed; the investment figure is developer-stated campus cost. Confidence is high: both figures come from the developer or a filing and the site has physical progress or firm contracts. Malachi.Energy tracks 4 mega projects in Indiana in total.

Key figures

Planned capacity

1.0 GW

Developer disclosed

Announced investment

$10 billion

Developer-stated campus cost

Status

Under construction

As of October 2026

Target year

2027

First load or full build per source

Where the figures come from

Capacity basis
Developer disclosed
Investment basis
Developer-stated campus cost
Nearest high-voltage transmission
The campus sits 5.1 miles from the nearest 230 kV transmission line, owned by Duke Energy Indiana, LLC, per HIFLD transmission data current to September 2023, computed 2026-10-02. No line rated 230 kV or higher passes within 5 miles of the campus. Source: HIFLD
Location basis
Public address, geocoded. The coordinate marks the campus, so distance facts on this page are measured from it. Location source: Daily Journal (AP/IBJ).
Confidence
High: both figures come from the developer or a filing and the site has physical progress or firm contracts.
Counted in headline totals
Yes. The investment figure is developer-stated campus cost and is comparable across projects.
Primary source
ConstructConnect, April 2026
Last verified
, dataset version 2026-10-03. Re-checked whenever the project list is refreshed.

Basis and confidence definitions are in the directory methodology.

What is known

Meta's 1 GW campus in the LEAP Innovation District broke ground in February 2026: 13 buildings across 4M sq ft, with the first buildings online between late 2027 and early 2028.

Location

Site
Lebanon, IN
Coordinates
40.05, -86.55
State directory
Data centers in Indiana (14 verified facilities)

Other tracked projects in Indiana

Cite this record

Rein, Malachi (2026). Meta Lebanon (Lebanon, IN). In US Data Center Directory, dataset version 2026-10-03. Malachi.Energy. https://malachi.energy/data-centers/projects/meta-lebanon-in

@misc{malachienergy_meta_lebanon_in_2026,
  author = {Rein, Malachi},
  title = {Meta Lebanon (Lebanon, IN)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-10-03. Capacity basis: Developer disclosed. Investment basis: Developer-stated campus cost.},
  url = {https://malachi.energy/data-centers/projects/meta-lebanon-in}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: developer disclosed. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.