Google Fort Wayne in Fort Wayne, IN is planned at 200 MW and about $2 billion, and is operational, with a 2030 target as of September 2026. It ranks 53rd of 54 tracked US mega projects by planned capacity, 0.2% of the 109.2 GW national total. The capacity figure is press or analyst reported; the investment figure is developer-stated campus cost. Confidence is medium: one figure is reported, estimated, or scoped differently than the campus. Malachi.Energy tracks 4 mega projects in Indiana in total.

Key figures

Planned capacity

200 MW

Press or analyst reported

Announced investment

$2 billion

Developer-stated campus cost

Status

Operational

As of September 2026

Target year

2030

First load or full build per source

Where the figures come from

Capacity basis
Press or analyst reported
Investment basis
Developer-stated campus cost
Confidence
Medium: one figure is reported, estimated, or scoped differently than the campus.
Counted in headline totals
Yes. The investment figure is developer-stated campus cost and is comparable across projects.
Primary source
Data Center Dynamics, December 2025
Last verified
, dataset version 2026-09-14. Re-checked at every data refresh.

Basis and confidence definitions are in the directory methodology.

What is known

Google's Fort Wayne campus: first building live December 2025, third phase (three more buildings) permitted March 2026 for construction from 2027 through 2030.

Location

Site
Fort Wayne, IN
Coordinates
41.08, -85.14
State directory
Data centers in Indiana (14 verified facilities)

Other tracked projects in Indiana

Cite this record

Rein, Malachi (2026). Google Fort Wayne (Fort Wayne, IN). In US Data Center Directory, dataset version 2026-09-14. Malachi.Energy. https://malachi.energy/data-centers/projects/google-fort-wayne

@misc{malachienergy_google_fort_wayne_2026,
  author = {Rein, Malachi},
  title = {Google Fort Wayne (Fort Wayne, IN)},
  howpublished = {US Data Center Directory, Malachi.Energy},
  year = {2026},
  note = {Dataset version 2026-09-14. Capacity basis: Press or analyst reported. Investment basis: Developer-stated campus cost.},
  url = {https://malachi.energy/data-centers/projects/google-fort-wayne}
}

All projects (JSON)All projects (CSV)Back to the directory

Figures are planned capacity and announced investment from public filings and reporting, not delivered power or audited spend. Capacity basis: press or analyst reported. Investment basis: developer-stated campus cost. Dataset version . Maintained by Malachi Rein for Malachi.Energy.